Real-time Form 4 intelligence. Smarter insider tracking.
YoY shift: Neutral
Year-over-year tone shift - average net-tone change across Risk Factors and MD&A vs the prior 10-K. This filing is -0.09pp more bearish than last year's.
Why YoY instead of absolute: the LM lexicon has ~6.6× more negative words than positive (legal/risk-disclosure language is heavy on hedging), so every 10-K reads bearish on raw tone. Year-over-year change strips that bias and surfaces the actual shift in management's framing.
Tone shift by section
The two components the gauge averages: how Risk Factors and MD&A each shifted in net tone versus last year's 10-K. The headline above is their average, so a green needle over a soft section just means the other section carried it.
Risk Factors
-0.14pp
Flat
Net-tone change vs last year's 10-K.
MD&A
-0.03pp
Flat
Net-tone change vs last year's 10-K.
Per-snippet highlights
Sentence-level sentiment highlighting with category and subcategory filters is coming once the snippet-scoring pipeline lands. For now, dig into the actual section text on the Sections tab.
Language change vs prior 10-K
Risk Factors (Item 1A) - words with the biggest YoY frequency increase
Negative rising
adverse+5
termination+3
delay+3
complaints+3
adversely+2
Positive rising
satisfied+2
opportunities+1
successful+1
attractive+1
Risk Factors (Item 1A)
8,970 words
Item 1A. Risk Factors
The risks and uncertainties discussed below could materially affect our business operations, financial position, results of operations and cash flows, and should be carefully considered by stakeholders. The risks and uncertainties in this section are not the only ones we face; additional risks and uncertainties that we are not presently aware of, or that we currently consider immaterial, may also affect our business operations, financial position, results of operations and cash flows. Accordingly, the risks described below should be carefully considered together with other information set forth in this report and in future reports that we file with the SEC.
Regulated Operations Risks
Our results of operations could be negatively impacted if our taconite, paper and pipeline customers experience an economic downturn, incur work stoppages, fail to compete effectively, experience decreased demand, fail to economically obtain raw materials, fail to renew or obtain necessary permits, or experience a decline in prices for their product.
Minnesota Power’s Large Power Customers (see Item 1. Business – Regulated Operations – Electric Sales / Customers) and Silver Bay Power accounted for 31 percent of our 2024 consolidated operating revenue (24 percent in 2023 and 29 percent in 2022) and 38 percent of Regulated Operations operating revenue (36 percent in 2023 and 36 percent in 2022). Minnesota Power’s taconite customers, which are currently owned by only two entities at the end of 2024, accounted for approximately 27 percent of consolidated operating revenue and 33 percent of Regulated Operations operating revenue in 2024. This concentrated ownership presents customer concentration risk for the Company, and could lead to further capacity consolidation for both steel blast furnaces and related Minnesota iron ore production. These customers are also involved in cyclical industries that by their nature are impacted by economic and are subject to competition in the marketplace. The North American paper and pulp industry also faces demand due to the impact of electronic substitution for print and changing customer needs. As a result, certain paper and pulp customers have reduced their existing operations or facilities in recent years and have pursued or are pursuing product changes in response to demand. Additionally, the taconite industry could be impacted by changing technology in the steel industry such as the adoption of electric arc furnaces for steelmaking, which could result in demand for taconite and the electricity used during its production.
Language change vs prior 10-K
MD&A (Item 7) - words with the biggest YoY frequency increase
Negative rising
outage+4
termination+3
late+2
negative+1
liquidated+1
Positive rising
progress+7
enhancing+2
great+1
enables+1
improvement+1
MD&A (Item 7)
13,769 words
Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations
The following discussion should be read in conjunction with our Consolidated Financial Statements and notes to those statements and the other financial information appearing elsewhere in this report. In addition to historical information, the following discussion and other parts of this Form 10-K contain forward-looking information that involves risks and uncertainties. Readers are cautioned that forward-looking statements should be read in conjunction with our disclosures in this Form 10-K under the headings: “Forward‑Looking Statements” located on page 7 and “Risk Factors” located in Item 1A. The risks and uncertainties described in this Form 10-K are not the only risks facing our Company. Additional risks and uncertainties that we are not presently aware of, or that we currently consider immaterial, may also affect our business operations. Our business, financial condition or results of operations could suffer if the risks are realized.
Overview
Basis of Presentation. We present two reportable segments: Regulated Operations and ALLETE Clean Energy. Our segments were determined in accordance with the guidance on segment reporting. We measure performance of our operations through budgeting and monitoring of contributions to consolidated net income by each business segment.
Regulated Operations includes our regulated utilities, Minnesota Power and SWL&P, as well as our investment in ATC, a Wisconsin-based regulated utility that owns and maintains electric transmission assets in portions of Wisconsin, Michigan, Minnesota and Illinois. Minnesota Power provides regulated utility electric service in northeastern Minnesota to approximately 150,000 retail customers. Minnesota Power also has 14 non-affiliated municipal customers in Minnesota. SWL&P is a Wisconsin utility and a wholesale customer of Minnesota Power. SWL&P provides regulated utility electric, natural gas and water service in northwestern Wisconsin to approximately 15,000 electric customers, 13,000 natural gas customers and 10,000 water customers. Our regulated utility operations include retail and wholesale activities under the jurisdiction of state and federal regulatory authorities . (See Note 4. Regulatory Matters.)
Minnesota Power also serves two pipeline customers that accounted for 2 percent of our 2024 consolidated operating revenue (2 percent in 2023 and in 2022) and 2 percent of Regulated Operations revenue in 2024 (3 percent in 2023 and 2 percent in 2022). These customers are involved in an industry that is seeing increased environmental pressure for construction of new or expanded pipeline infrastructure for the transportation of fossil fuels. Changes in regulatory rulings or permit proceedings could result in changes to operations of the pipeline network in our service territory.
Accordingly, if our industrial customers experience an economic downturn, incur a work stoppage (including strikes, lock-outs or other events), fail to compete effectively, experience decreased demand, fail to economically obtain raw materials or operate their facilities, fail to renew or obtain necessary permits, or experience a decline in demand or prices for their product, there could be adverse effects on their operations and, consequently, this could have a negative impact on our results of operations as we are unable to remarket at similar prices the energy that would otherwise have been sold to such customers.
We may not be able to successfully implement our strategic objectives of growing load at our utilities if current or potential industrial or municipal customers are unable to successfully implement expansion plans, including the inability to obtain necessary governmental permits and approvals.
As part of our long-term strategy, we pursue new wholesale and retail loads in and around our service territories. Currently, there are several companies in northeastern Minnesota that are in the process of developing natural resource-based projects that represent long-term growth potential and load diversity for our Regulated Operations businesses. These projects may include construction of new facilities and restarts of old facilities, both of which require permitting and approvals to be obtained before the projects can be successfully implemented. If a project does not obtain any necessary governmental (including environmental) permits and approvals or if these customers are unable to successfully implement expansion plans, our long-term strategy and thus our results of operations could be adversely impacted.
ALLETE, Inc. 2024 Form 10-K
Item 1A. Risk Factors (Continued)
Regulated Operations Risks (Continued)
Our businesses, investments and customers are subject to an extensive legal and regulatory framework under federal and state laws as well as regulations imposed by other organizations that may have a negative impact on our business and results of operations.
Our businesses, investments and customers are subject to an extensive legal and regulatory framework imposed under federal and state law including regulations administered by the FERC, MPUC, MPCA, PSCW, NDPSC and EPA as well as regulations administered by other organizations including the NERC. These laws and regulations relate to allowed rates of return, capital structure, financings, rate and cost structure, acquisition and disposal of assets and facilities, construction and operation of generation, transmission and distribution facilities (including the ongoing maintenance and reliable operation of such facilities), recovery of purchased power costs and capital investments, approval of integrated resource plans and present or prospective wholesale and retail competition, renewable portfolio standards that require utilities to obtain specified percentages of electric supply from eligible renewable generation sources, among other things. Energy policy initiatives at the state or federal level could increase or accelerate renewable and carbon-free energy standards or incentives for distributed generation, municipal utility ownership, or local initiatives could introduce generation or distribution requirements that could change the current integrated utility model. (See Item 1. Business – Regulated Operations – Minnesota Legislation.) Our transmission systems and electric generation facilities are subject to the NERC mandatory reliability standards, including cybersecurity standards. Compliance with these standards may lead to increased operating costs and capital expenditures which are subject to regulatory approval for recovery. If it was determined that we were not in compliance with these mandatory reliability standards or other statutes, rules and orders, we could incur substantial monetary penalties and other sanctions, which could adversely affect our results of operations.
These laws and regulations significantly influence our operations and may affect our ability to recover costs from our customers. We are required to have numerous permits, licenses, approvals and certificates from the agencies and other organizations that regulate our business. We believe we have obtained the necessary permits, licenses, approvals and certificates for our existing operations and that our business is conducted in accordance with applicable laws; however, we are unable to predict the impact on our operating results from the future regulatory activities of any of these agencies and other organizations. Changes in regulations, timing of approvals, the adoption of new regulations or the expansion of jurisdiction by these agencies and other organizations could have an adverse impact on our business and results of operations. In addition, our ability to manage changing regulations could be impacted by our rights and obligations under joint ownership agreements.
Our ability to obtain rate adjustments to maintain reasonable rates of return depends upon regulatory action under applicable statutes and regulations, and we cannot provide assurance that rate adjustments will be obtained or reasonable authorized rates of return on capital will be earned. Minnesota Power and SWL&P, from time to time, file general rate cases with, or otherwise seek cost recovery authorization from, federal and state regulatory authorities. If Minnesota Power and SWL&P do not receive an adequate amount of rate relief in general rate cases, including if rates are reduced, if increased rates are not approved or recovered on a timely basis, if fuel adjustment clause recoveries or cost recovery for other items are not granted at the requested level, or costs are otherwise unable to be recovered through rates, we may experience an adverse impact on our financial position, results of operations and cash flows. We are unable to predict the impact on our business and results of operations from future legislation or regulatory activities of any of these agencies or organizations.
Our regulated operations present certain environmental risks that could adversely affect our financial position and results of operations, including effects of environmental laws and regulations, physical risks associated with climate change and initiatives designed to reduce the impact of GHG emissions.
We are subject to extensive environmental laws and regulations affecting many aspects of our past, present and future operations, including air quality, water quality and usage, waste management, reclamation, hazardous wastes, avian mortality and natural resources. These laws and regulations, or new laws and regulations that may be passed, can result in increased capital expenditures and increased operating and other costs as a result of compliance, remediation, containment and monitoring obligations, particularly with regard to laws relating to emissions, coal ash and water discharge at generating facilities.
These laws and regulations could restrict the output of some existing facilities, limit the use of some fuels in the production of electricity, require the installation of additional pollution control equipment, require participation in environmental emission allowance trading, and lead to other environmental considerations and costs, which could have an adverse impact on our business, operations and results of operations.
ALLETE, Inc. 2024 Form 10-K
Item 1A. Risk Factors (Continued)
Regulated Operations Risks (Continued)
These laws and regulations generally require us to obtain and comply with a wide variety of environmental licenses, permits, inspections and other approvals. Violations of these laws and regulations could expose us to regulatory and legal proceedings, disputes with, and legal challenges by, governmental authorities and private parties, as well as potential significant civil finescriminalpenalties and other sanctions. On August 12, 2024, Minnesota Power received a Notice of Violation (NOV) from the MPCA, related to the spill at Boswell from a pipeline carrying ash wastewater from an inactive onsite storage pond to Blackwater Creek, which the Company reported on July 16, 2024. Minnesota Power continues to work with state and federal agencies to evaluate and mitigate the impacts from this event. We are unable to predict the mitigation or other costs related to the ash wastewater spill at this time; however, the costs could be material. (See Note 9. Commitments, Guarantees and Contingencies.)
Existing environmental regulations may be revised and new environmental regulations may be adopted or become applicable to us. Revised or additional regulations which result in increased compliance costs or additional operating restrictions, particularly if those costs are not fully recoverable from customers, could have an adverse effect on our results of operations.
There is significant uncertainty regarding if and when new laws, regulations or administrative policies will be adopted to reduce or limit GHG and the impact any such laws or regulations would have on us. In 2024, our operating coal-fired generating facilities consisted of the 352 MW Boswell Unit 3 and the 468 MW Boswell Unit 4. (See Item 7. Management Discussion and Analysis of Financial Condition and Results of Operation – Outlook – EnergyForward.) Any future limits on GHG emissions at the federal or state level, or action taken by regulators, before these facilities are retired or become coal-free may require us to incur significant capital expenditures and increases in operating costs, or could result in early closure of coal-fired generating facilities, stranded assets, an impairment of assets, denial of full recovery of decommissioning costs in excess of amounts previously collected, or otherwise adversely affect our results of operations, particularly if resulting expenditures and costs are not fully recoverable from customers.
Our regulated operations may be adversely impacted by the physical and financial risks associated with climate change. See Entity-wide Risks for additional discussion of risks related to GHG and climate change.
We cannot predict the amount or timing of all future expenditures related to environmental matters because of uncertainty as to applicable regulations or requirements. There is also uncertainty in quantifying liabilities under environmental laws that impose joint and several liability on all potentially responsible parties. Violations of certain environmental statutes, rules and regulations could expose ALLETE to third party disputes and potentially significant monetary penalties, as well as other sanctions for noncompliance.
The operation and maintenance of our regulated electric generation, transmission and distribution facilities are subject to operational risks that could adversely affect our financial position, results of operations and cash flows.
The operation of generating facilities involves many risks, including start-up operational risks, breakdown or failure of facilities, the dependence on a specific fuel source, inadequate fuel supply, availability of fuel transportation, and the impact of unusual or adverse weather conditions or other natural events, as well as the risk of performance below expected levels of output or efficiency. A significant portion of our facilities contain older generating equipment, which, even if maintained in accordance with good engineering practices, may require significant capital expenditures to continue operating at peak efficiency. Generation, transmission and distribution facilities and equipment are also likely to require periodic upgrades and improvements due to changing environmental standards and technological advances. Our ability to manage and operate certain facilities could also be impacted by our rights and obligations under the joint ownership agreements. We could be subject to costs associated with any unexpectedfailure to produce or deliver power, including failure caused by breakdown, forcedoutage or limited availability of fuel or fuel transportation, as well as the repair of damage to facilities due to breakdown, storms, natural disasters, wars, sabotage, terrorist acts and other catastrophic events. This could also lead to requiring additional purchased power to meet requirements of serving our retail load, which for Minnesota Power is subject to recovery under the fuel adjustment clause. Should these costs be denied or are otherwise unable to be recovered, our financial position, results of operations and cash flows could be adversely impacted.
ALLETE, Inc. 2024 Form 10-K
Item 1A. Risk Factors (Continued)
Regulated Operations Risks (Continued)
Our ability to successfully and timely complete capital repairs or improvements to existing regulated facilities or in the development of new electric generation and transmission facilities or other capital projects is contingent upon many variables.
We expect to incur significant capital expenditures in making capital repairs or improvements to our existing electric generation and transmission facilities and in the development and construction of new electric generation and transmission facilities. Should any such efforts be unsuccessful, not completed in a timely manner, if we are unable to obtain the necessary permits, land rights and regulatory approvals, or if there are increases in the costs for or limited availability of key materials, supplies, labor and services, we could be subject to additional costs or impairments, and projects may be delayed or canceled which could have an adverse impact on our financial position, results of operation and cash flows.
Our regulated electric operations may not have access to adequate and reliable transmission and distribution facilities necessary to deliver electricity to our customers.
We depend on our own transmission and distribution facilities, as well as facilities owned by other utilities, to deliver the electricity sold to our customers, and to other energy suppliers. If transmission capacity is inadequate or transmission and distribution facilities we rely on are damaged, our ability to sell and deliver electricity may be limited. We may have to forgo sales or may have to buy more expensive wholesale electricity that is available in a capacity-constrained area. The ability to restore adequate capacity or repair damaged infrastructure may be impacted by the availability of key materials, supplies, labor and services, which if unavailable may prolong the impact of capacity constraints or damaged facilities. In addition, any infrastructure failure or damage that interrupts or impairs delivery of electricity to our customers could negatively impact the satisfaction of our customers, which could have an adverse impact on our business and results of operations.
The price of electricity may be volatile and fuel may be volatile and availability may be limited.
Volatility in market prices for electricity and volatility and limited availability of fuel could adversely impact our financial position and results of operations and may result from:
• severe or unexpected weather conditions and natural disasters;
• seasonality;
• changes in electricity usage;
• transmission or transportation constraints, inoperability or inefficiencies;
• availability of competitively priced alternative energy sources;
• changes in supply and demand for energy;
• changes in power production capacity;
• outages at our generating facilities or those of our competitors;
• availability of fuel and transportation of fuel;
• changes in production and storage levels of natural gas, lignite, coal, crude oil and refined products;
• wars, sabotage, terrorist acts, cybersecurity attacks or other catastrophic events; and
• federal, state, local and foreign energy, environmental, or other regulation and legislation, including the direct and indirect effects of new or changes in tariffs.
Volatility in market prices for our fuel and purchased power costs impacts our sales to retail, municipal and Other Power Suppliers. Fluctuations in our fuel and purchased power costs related to our retail and municipal customers are passed on to customers through the fuel adjustment clause; however, our results of operations and cash flows may be adversely impacted if increased fuel adjustment clause rates are not approved or recovered on a timely basis, if cost recovery is not granted at the requested level, or costs are otherwise unable to be recovered through the fuel adjustment clause.
Wholesale prices for electricity have also declined in recent years primarily due to the extension of renewable tax credits and additional renewable generation commencing operations. If there are reductions in demand from current customers, we lose retail customers, or we lose municipal customers that do not renew existing contracts, we will market any available power to Other Power Suppliers in an effort to mitigate any earnings impact. Sales to Other Power Suppliers are sold at market-based prices into the MISO market on a daily basis or through bilateral agreements of various durations. Due to wholesale prices for electricity being below our rates for retail and municipal customers, we do not expect that our power marketing efforts would fully offset the reduction in earnings resulting from the lower demand from existing customers or the loss of customers. (See Item 1. Business – Regulated Operations – Electric Sales / Customers.)
ALLETE, Inc. 2024 Form 10-K
Item 1A. Risk Factors (Continued)
Regulated Operations Risks (Continued)
Demand for energy may decrease.
Our results of operations are impacted by the demand for energy in our service territories, our municipal customers and other power suppliers. There could be lower demand for energy due to a loss of customers as a result of economic conditions, customers constructing or installing their own generation facilities, higher costs and rates charged to customers, eligible municipal and other power suppliers choosing an alternative energy provider, or loss of service territory or franchises. Further, energy conservation and technological advances that increased energy efficiency may temporarily or permanently reduce the demand for energy products. In addition, we are impacted by state and federal regulations requiring mandatory conservation measures, which reduce the demand for energy products. Continuing technology improvements and regulatory developments may make customer and third party-owned generation technologies such as rooftop solar systems, WTGs, microturbines and battery storage systems more cost effective and feasible for certain customers. If customers utilize their own generation, demand for energy from us would decline. There may not be future economic growth opportunities that would enable us to replace the lost energy demand from these customers. Therefore, a decrease in demand for energy could adversely impact our financial position, results of operations and cash flows.
ALLETE Clean Energy / Corporate and Other Risks
The inability to successfully manage and grow our businesses could adversely affect our results of operations.
The Company's strategy includes adding customers, new geographies, and growth through acquisitions or project development with long-term PSAs in place for the output or to be sold upon completion. This strategy depends, in part, on the Company’s ability to successfully identify and evaluate acquisition or development opportunities and consummate acquisitions on acceptable terms and obtain all required permits and approvals. The Company may compete with other companies for these acquisition and development opportunities, which may increase the Company’s cost of making acquisitions and the Company may be unsuccessful in pursuing these acquisition opportunities. Other companies may be able to pay more for acquisitions and may be able to identify, evaluate, bid for and purchase a greater number of assets than the Company’s financial or human resources permit. New laws and regulations promoting renewable energy generation may result in increased competition. Our ALLETE Clean Energy business is experiencing return pressures from increased competition, and lower forward price curves, as a growing amount of investment capital is being directed into wind energy generation opportunities. In addition, current and potential new project developments at our businesses can be negatively affected by a lower ALLETE stock price, which may result in such projects not being accretive, or otherwise unable to satisfy our financial objectives criteria to proceed. Additionally, tax law changes may adversely impact the economic characteristics of potential acquisitions or investments. If the Company is unable to execute its strategy of growth through acquisitions, project development for others, or the addition of new customers and geographies, it may impede our long-term objectives and business strategy.
Acquisitions and operations of recently acquired entities are subject to uncertainties. If we are unable to successfully integrate and manage future acquisitions and strategic investments, this could have an adverse impact on our results of operations. Our actual results may also differ from our expectations due to factors such as the ability to obtain timely regulatory or governmental approvals, integration and operational issues and the ability to retain management and other key personnel.
The generation of electricity from wind and solar energy facilities depends heavily on suitable meteorological conditions.
Although our electric generation facilities are located in diverse geographic regions to reduce the potential impact that may be caused by unfavorable weather in a particular region, suitable meteorological conditions are variable and difficult to predict. If wind or solar conditions are unfavorable or meteorological conditions are unsuitable, electricity generation and revenue from wind and solar energy facilities may be substantially below our expectations. The electricity produced, production tax credits received, and revenues generated by a wind or solar energy facility are highly dependent on suitable wind conditions and associated weather conditions, which are variable and beyond our control. We base our decisions about which wind and solar projects to build or acquire as well as our electricity generation estimates, in part, on the findings of long-term wind and other meteorological studies conducted on the project site and its region; however, the unpredictable nature of wind and solar conditions, weather and meteorological conditions can result in material deviations from these studies and our expectations. Furthermore, components of our systems could be damaged by severe weather, such as hailstorms, lightning or tornadoes. In addition, replacement and spare parts for key components may be difficult or costly to acquire or may be unavailable. Unfavorable wind and solar conditions, weather or changes to meteorological patterns could impair the effectiveness of our electric generation facility assets, reduce their output beneath their rated capacity or require shutdown of key equipment, impeding operation of our wind energy facilities or lead to an impairment of assets.
ALLETE, Inc. 2024 Form 10-K
Item 1A. Risk Factors (Continued)
ALLETE Clean Energy / Corporate and Other Risks (Continued)
The construction, operation and maintenance of our electric generation facilities or investment in facilities are subject to operational risks that could adversely affect our financial position, results of operations and cash flows.
The construction and operation of generating facilities involves many risks, including the performance by key contracted suppliers and maintenance providers; increases in the costs for or limited availability of key materials, supplies, labor and services; start-up operations risks; breakdown or failure of facilities; curtailment of facilities by counterparties or due to inadequate transmission capacity; the dependence on the availability of wind resources; or the impact of unusual, adverse weather conditions or other natural events, as well as the risk of performance below expected levels of output or efficiency. Some of our facilities contain older generating equipment, which even if maintained in accordance with good engineering practices, may require significant capital expenditures to continue operating at peak efficiency. We could be subject to costs associated with any unexpectedfailure to produce and deliver power, including failure caused by breakdown or forcedoutage, as well as the repair of damage to facilities due to storms, natural disasters, wars, sabotage, terrorist acts and other catastrophic events.
The price of electricity may be volatile, which may impact results of operations at ALLETE Clean Energy wind energy facilities under contracts with commercial and industrial (C&I) customers.
Unusual, adverse weather conditions or other natural events and different settlement prices between hub and node can cause volatility in market prices for electricity and adversely affect our financial position, results of operations and cash flows. ALLETE Clean Energy’s power sales agreements with C&I customers at its Diamond Spring and Caddo wind energy facilities are contracts for differences where power is delivered to the market, a fixed price is paid by the customers to ALLETE Clean Energy, and differences between the market price and the fixed price are paid to or received from the customers. Certain contracts also settle with the market at the hub price whereas ALLETE Clean Energy settles with the customer at the node price which can vary significantly based on multiple factors. These settlement provisions can result in an adverse impact on our financial position, results of operations and cash flows when market prices are volatile, or lead to potential impairment of property, plant and equipment if these conditions persist for an extended period of time.
As contracts with counterparties expire, we may not be able to replace them with agreements on similar terms or divest the related assets at a profit.
ALLETE Clean Energy is party to PSAs that expire in various years between 2027 and 2039. These PSA expirations are prior to the end of the estimated useful lives of the respective wind energy facilities. If, for any reason, ALLETE Clean Energy is unable to enter into new agreements with existing or new counterparties on similar terms once the current agreements expire, sell energy in the wholesale market resulting in similar revenue, or enter into a contract to sell the facility at a profit, our financial position, results of operations and cash flows could be adversely affected, which includes potential impairment of property, plant and equipment.
Counterparties to turbine and other generation supply, service and maintenance, or power sale agreements may not fulfill their obligations.
Our businesses are party to turbine and other generation supply agreements, service and maintenance agreements, and PSAs under various durations with a limited number of creditworthy counterparties. If, for any reason, any of the counterparties under these agreements do not fulfill their related contractual obligations, and we are unable to mitigate non-performance by a key supplier or maintenance provider or remarket PSA energy resulting in similar revenue, our financial position, results of operations and cash flows could be adversely affected.
ALLETE has a significant amount of goodwill. A determination that goodwill has been impaired could result in a significant non-cash charge to earnings.
We had approximately $155 million of goodwill recorded on our Consolidated Balance Sheet as of December 31, 2024, related to New Energy. If we change our business strategy, fail to deliver on our projected results or if market or other conditions adversely affect the operations of New Energy, we may be required to record an impairment charge. Declines in projected operating cash flows at New Energy could also result in an impairment charge. An impairment charge would result in a non-cash charge to earnings that could have an adverse effect on our results of operations.
ALLETE, Inc. 2024 Form 10-K
Item 1A. Risk Factors (Continued)
ALLETE Clean Energy / Corporate and Other Risks (Continued)
BNI Energy may be adversely impacted by its exposure to customer concentration, and environmental laws and regulations.
BNI Energy sells lignite coal to two electric generating cooperatives, Minnkota Power and Square Butte, and could be adversely impacted if these customers were unable or unwilling to fulfill their related contractual obligations, or change the way in which they operate their generating facilities. In addition, BNI Energy and its customers may be adversely impacted by existing or new environmental laws and regulations which could have an adverse effect on our financial position, results of operations and cash flows. In addition, insurance companies have decreased the available coverage for policy holders in the mining industry, impacting the availability of coverage, and leading to higher deductibles and premiums.
Real estate market conditions where our legacy Florida real estate investment is located may deteriorate.
The Company’s strategy related to the real estate assets of ALLETE Properties incorporates the possibility of a bulk sale of its entire portfolio, in addition to sales over time, however, adverse market conditions could impact the timing of land sales, which could result in little to no sales, while still incurring operating expenses such as community development district assessments and property taxes, resulting in net operating losses at ALLETE Properties. Furthermore, weak market conditions could put the properties at risk for an impairment charge. An impairment charge would result in a non-cash charge to earnings that could have an adverse effect on our results of operations.
Entity-wide Risks
We could be materially adversely affected by health epidemics, pandemics and other outbreaks.
Health epidemics, pandemics and other outbreaks, as well as the related federal and state government responses, can have widespread impacts on the economy and on our employees, customers, contractors and suppliers, such as those experienced from the COVID-19 pandemic. There may be uncertainty regarding the length of time an epidemic, pandemic or other outbreak will last, how they will evolve, or the extent and duration of any measures attempted to try and contain them.
A disruption of economic activity or an extended disruption of economic activity may lead to adverse impacts on our taconite, paper, pulp and secondary wood products, and pipeline customers’ operations including reduced production or the temporary idling or indefinite shutdown of facilities, which would result in lower sales and revenue from these customers. A disruption in capital markets could lead to increased borrowing costs or adversely impact our ability to access capital markets or other financing sources, which would adversely affect our ability to maintain our businesses or to implement our business plans. An epidemic, pandemic or other outbreak may also result in a disruption to our supply chains which could adversely impact our operations and capital projects resulting in project and operational delays, project cancellations, lower returns on projects and cost increases.
Despite any efforts made to mitigate the impacts on the Company of an epidemic, pandemic or other outbreak, their ultimate impact also depends on factors beyond our control, including their duration and severity as well as governmental and third-party actions taken to contain their spread and mitigate their public health effects. As a result, we cannot predict the ultimate impact of an epidemic, pandemic or other outbreak, such as the COVID-19 pandemic and whether it will have a material impact on our liquidity, financial position, results of operations and cash flows.
We rely on access to financing sources and capital markets. If we do not have access to capital on acceptable terms or are unable to obtain capital when needed, our ability to execute our business plans, make capital expenditures or pursue other strategic actions that we may otherwise rely on for future growth would be adversely affected.
We rely on access to financing sources and the capital markets, on acceptable terms and at reasonable costs, as sources of liquidity for capital requirements not satisfied by our cash flows from operations. Rising interest rates, inflation and market disruptions or a downgrade of our credit ratings may increase the cost of borrowing or adversely affect our ability to access and finance in the capital markets or to access other financing sources such as tax equity financing. Such disruptions or causes of a downgrade could include but are not limited to: weakening of the Company’s cash flow metrics; a loss of, or a reduction in sales to, our taconite, paper and pipeline customers if we are unable to offset the related lost margins; weaker operating performance; adverse regulatory outcomes; disproportionate increase in the contribution to net income from ALLETE Clean Energy and our Corporate and Other businesses as compared to that from our Regulated Operations; deteriorating economic or capital market conditions; or volatility in commodity prices.
ALLETE, Inc. 2024 Form 10-K
Item 1A. Risk Factors (Continued)
Entity-wide Risks (Continued)
If we are not able to access capital on acceptable terms in sufficient amounts and when needed, or at all, the ability to maintain our businesses or to implement our business plans would be adversely affected. This would include our ability to make the significant capital expenditures planned in order to achieve Minnesota Power’s clean-energy transition plans. (See Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations – Capital Requirements.)
A deterioration in general economic conditions, an inflationary environment or supply chain disruptions may have adverse impacts on our financial position, results of operations and cash flows.
If economic conditions deteriorate, we experience an inflationary environment or supply chains are disrupted on a national, regional or global level, it may have a negative impact on our customers and the Company’s financial position, results of operations and cash flows. This impact may include volatility and unpredictability in the demand for the products and services offered by our businesses, the loss of existing customers, tempered growth strategies, customer production cutbacks, customer bankruptcies and increases in costs for or limited availability of key materials, supplies, labor and services for our operations and capital projects. An uncertain economy could also adversely affect expenses including pension costs, interest costs, and uncollectible accounts, or lead to reductions in the value of certain real estate and other investments.
Our utility infrastructure and generating facilities, ongoing and future capital and development projects, and other operations require components, supplies, materials, labor and services sourced from suppliers or providers who, in turn, may source components from their suppliers. A shortage of key components, supplies, materials, labor or services in which an alternative supplier or provider is not identified could significantly impact project plans or our operations. Such impacts could include project delays, including potential for project cancellation, lower project returns, increased costs or the inability to provide service to customers, which could adversely impact our results of operations, financial condition or cash flows.
Our results of operations could be adversely affected by changes in governmental incentives or policies that support renewable energy or changes in taxes, tariffs, duties or other assessments on renewable energy or the equipment necessary to generate and deliver it.
Any reductions or modifications to, or the elimination of, governmental incentives or policies that support renewable energy, or the imposition of additional or increased sourcing of components subject to taxes, tariffs, duties or other assessments on renewable energy or the equipment necessary to generate and deliver it, could result in, among other items, the lack of a satisfactory market for the development or financing of new renewable energy projects and reduced project returns on current or future projects.
The U.S. government currently imposes anti-dumping and countervailing duties on certain imported photovoltaic (PV) cells and modules from China and Taiwan. Such duties can change over time pursuant to annual reviews conducted by the U.S. Department of Commerce (DOC). On August 18, 2023, the U.S. DOC issued a final affirmative determination that imports of certain PV cells and modules assembled and completed in Cambodia, Malaysia, Thailand, and Vietnam are circumventing anti-dumping and countervailing duties. Duties were not collected on imports before June 2024 as a result of a temporary duty suspension ordered by the U.S. President. Our operating results could be adversely impacted if this U.S. DOC circumvention determination results in duties assessed on future purchases made by our businesses after the current moratorium ends, or if additional anti-dumping and countervailing duties are imposed by the U.S. government on products purchased by our businesses.
ALLETE, Inc. 2024 Form 10-K
Item 1A. Risk Factors (Continued)
Entity-wide Risks (Continued)
Our results of operations could be adversely affected by changes in governmental policy related to taxes, tariffs and duties, as well as grants and other incentives.
Our business, investments and customers could be adversely affected by the direct and indirect effects of recently proposed and new tariffs, or changes in existing tariffs, on purchases from suppliers located outside of the U.S. or suppliers with products sourced from outside of the U.S.
Minnesota Power has PPAs that provide for the purchase of capacity and energy from Manitoba Hydro in Canada and also purchases other energy and capacity through MISO or under bilateral contracts with other power suppliers that may be sourced from outside of the U.S. A portion of SWL&P’s natural gas purchases for resale in its regulated service territory is also sourced from Canada. In addition, the Company has various other agreements for the purchase of equipment and other components for use in our operations or capital projects that may be sourced from outside the U.S. We are evaluating the impact of proposed tariffs on our operations, capital projects and purchases from and agreements with suppliers.
The U.S. Department of Energy (DOE) previously awarded grants on two transmission projects that are currently under various stages of development. (See Outlook – Transmission – North Plains Connector Development Agreement and HVDC Transmission System Project.) These projects could be materially affected by changes in DOE’s funding policies.
Our businesses, investments and customers are subject to extensive state and federal legislation and regulation, compliance with which could have an adverse effect on our businesses.
Our businesses, investments and customers are subject to, and affected by, extensive state and federal legislation and regulation. If it was determined that our businesses failed to comply with applicable laws and regulations, we could become subject to fines or penalties or be required to implement additional compliance measures or actions, the cost of which could be material. If we are unable to obtain all required permits and approvals for our development projects, it could negatively impact our ability to execute on our EnergyForward strategy. Adoption of new laws, rules, regulations, principles, public policy positions or practices and their interpretations by federal and state agencies, or changes to or a failure to comply with current laws, rules, regulations, principles, public policy positions or practices and their interpretations, could have an adverse effect on our financial position, results of operations and cash flows.
The inability to attract and retain a qualified workforce including, but not limited to, executive officers, key employees and employees with specialized skills, could have an adverse effect on our operations.
The success of our business heavily depends on the leadership of our executive officers and key employees to implement our business strategy. The inability to maintain a qualified workforce, including, but not limited to, executive officers, key employees and employees with specialized skills, may negatively affect our ability to service our existing or new customers, or successfully manage our business or achieve our business objectives. Personnel costs may increase due to competitive pressures, inflation or terms of collective bargaining agreements with union employees.
Market performance and other changes could decrease the value of pension and other postretirement benefit plan assets, which may result in significant additional funding requirements and increased annual expenses.
The performance of the capital markets impacts the values of the assets that are held in trust to satisfy future obligations under our pension and other postretirement benefit plans. We have significant obligations to these plans and the trusts hold significant assets. These assets are subject to market fluctuations and will yield uncertain returns, which may fall below our projected rates of return. A decline in the market value of the pension and other postretirement benefit plan assets would increase the funding requirements under our benefit plans if asset returns do not recover. Additionally, our pension and other postretirement benefit plan liabilities are sensitive to changes in interest rates. As interest rates decrease, the liabilities increase, potentially increasing benefit expense and funding requirements. Our pension and other postretirement benefit plan costs are generally recoverable in our electric rates as allowed by our regulators or through our cost-plus fixed fee coal supply agreements at BNI Energy; however, there is no certainty that regulators will continue to allow recovery of these rising costs in the future.
ALLETE, Inc. 2024 Form 10-K
Item 1A. Risk Factors (Continued)
Entity-wide Risks (Continued)
We are exposed to significant reputational risk.
The Company could suffernegative impacts to its reputation as a result of operational incidents, violations of corporate compliance policies, such as our code of business conduct, by employees, directors of ALLETE, contractors, vendors and others who do business with or on behalf of ALLETE, regulatory violations, operations that produce or enable the production of GHG emissions or other events which may result in negative customer perception, increased regulatory oversight, and negative consequences to our credit ratings and ability to access capital, each of which could have an adverse effect on our financial position, results of operations and cash flows.
We are subject to physical and financial risks associated with climate change and other catastrophic events, such as natural disasters and acts of war.
Catastrophic events at or near Company facilities and equipment on which the Company depends upon or that otherwise impact the Company such as fires, wildfires, including the impact to Company facilities and operations or potential liability if caused by Company equipment, earthquakes, explosions, and floods, severe weather, such as ice storms, hailstorms, or tornadoes or similar occurrences, as well as acts of war, could adversely affect the Company’s facilities, operations, financial position, results of operations and cash flows. Although the Company has contingency plans and employs crisis management to respond and recover operations in the event of a severedisruption resulting from a catastrophic event, these measures may not be successful. Furthermore, despite these measures, if a catastrophic event were to occur, our financial position, results of operations and cash flows could be adversely affected.
The scientific community generally accepts that emissions of GHG are linked to global climate change. Physical risks of climate change, such as more frequent, longer duration or more extreme weather events, changes in temperature and precipitation patterns, increased risk of wildfires, changes to ground and surface water availability, and other related phenomena, could affect some, or all, of our operations. Severe weather or other natural disasters could be destructive, which could result in increased costs or limit the availability of key materials, supplies, labor and services used in our operations or to respond to damaged facilities. An extreme weather event can also directly affect our capital assets, causing disruption in service to customers due to facility outages, downed wires and poles or damage to other operating equipment.
Climate-related risks that could adversely affect our financial position and results of operations include effects of environmental- or economic-based laws, regulations, incentives or initiatives designed to reduce the quantity or impact of GHG emissions, the ability of our regulated businesses to obtain rate adjustments to recover costs and investments to implement clean-energy transition plans, or disruptions to the economy or energy markets caused by climate change. This includes the risk of laws or regulations that create mandates that do not allow for a transition that protects the safety, reliability or affordability of energy for our customers, are implemented before cost-effective technology is developed and regulatory policy is established, or require the electric sector to decarbonize faster than other sectors. Additionally, restrictions on land use, wildlife impacts, and other environmental regulations could affect the siting, construction and operation of new or existing generation and transmission facilities needed to transition to lower-carbon generation sources.
These all have the potential to adversely affect our business and operations.
We are vulnerable to acts of terrorism or cybersecurity attacks.
Our operations may be targets of terrorist activities or cybersecurity attacks, which could disrupt our ability to provide utility service at our regulated utilities, develop or operate our renewable energy projects at ALLETE Clean Energy, or operate our other businesses. The impacts may also impair the fulfillment of critical business functions, negatively impact our reputation, subject us to litigation or increased regulation, or compromise sensitive, confidential and other data.
There have been cybersecurity attacks on U.S. energy infrastructure in the past and there may be such attacks in the future. Our generation, transmission and distribution facilities, information technology systems and other infrastructure facilities and systems could be direct targets of, or otherwise be materially adversely affected by such activities. Hacking, computer viruses, terrorism, theft and sabotage could impact our systems and facilities, or those of third parties on which we rely, which may disrupt our operations.
ALLETE, Inc. 2024 Form 10-K
Item 1A. Risk Factors (Continued)
Entity-wide Risks (Continued)
Our businesses require the continued operation of sophisticated custom-developed, purchased, and leased information technology systems and network infrastructure as well as the collection and retention of personally identifiable information of our customers, shareholders and employees. Although we maintain security measures designed to prevent cybersecurity incidents and protect our information technology and control systems, network infrastructure and other assets, our technology systems, or those of third parties on which we rely, may be vulnerable to disability, failures or unauthorized access due to hacking, viruses, acts of war or terrorism as well as other causes. If those technology systems fail or are breached and not recovered in a timely manner, we may be unable to perform critical business functions including effectively maintaining certain internal controls over financial reporting, our reputation may be negatively impacted, we may become subject to litigation or increased regulation, and sensitive, confidential and other data could be compromised. If our business were impacted by terrorist activities or cybersecurity attacks, such impacts could have an adverse effect on our financial position, results of operations and cash flows.
We maintain insurance against some, but not all, of the risks and uncertainties we face.
We maintain insurance against some, but not all, of the risks and uncertainties we face. The occurrence of these risks and uncertainties, if not fully covered by insurance, could have a material effect on our financial position, results of operations and cash flows.
Government challenges to our tax positions, as well as tax law changes and the inherent difficulty in quantifying potential tax effects of our operations and business decisions, could adversely affect our results of operations and liquidity.
We are required to make judgments regarding the potential tax effects of various financial transactions and our ongoing operations in order to estimate our obligations to taxing authorities. The obligations, which include income taxes and taxes other than income taxes, involve complex matters that ultimately could be litigated. We also estimate our ability to use tax benefits, including those in the form of carryforwards and tax credits that are recorded as deferred tax assets on our Consolidated Balance Sheet. A disallowance of some or all of these tax benefits could have an adverse impact on our financial position, results of operations and cash flows.
We are currently utilizing, and plan to utilize in the future, our carryforwards and tax credits to reduce our income tax obligations. If we cannot generate enough taxable income in the future to utilize all of our carryforwards and tax credits before they expire, we may incur adverse charges to earnings.
If federal or state tax authorities deny any deductions or tax credits, negatively change existing tax laws or policies, or fail to extend or renew policies beneficial to the Company, such as those for renewable energy production tax credits, our financial position, results of operations and cash flows may be adversely impacted.
Our business, financial position, results of operations, and cash flows could be materially affected by adverse results of litigation.
We are involved in litigation arising in the normal course of business. Unfavorable resolution of legal or administrative proceedings in which we are involved or other future legal or administrative proceedings may have an adverse effect on our business, financial position, results of operations and cash flows.
ALLETE, Inc. 2024 Form 10-K
Item 1A. Risk Factors (Continued)
Risks Relating to the Merger
On May 5, 2024, ALLETE entered into the Merger Agreement. (See Note 15. Agreement and Plan of Merger.)
There is no assurance when or if the Merger will be completed, and there could be an adverse effect on the Company’s business, results of operations, financial condition or cash flows if the Merger is not completed or is delayed.
Consummation of the Merger is subject to various closing conditions, including: (1) approval of the shareholders of ALLETE; (2) receipt of all required regulatory approvals without the imposition of a Burdensome Condition (as defined in the Merger Agreement); (3) absence of any law or order prohibiting the consummation of the Merger; (4) subject to materiality qualifiers, the accuracy of each party’s representations and warranties; (5) each party’s compliance in all material respects with its obligations and covenants under the Merger Agreement; and (6) the absence of a material adverse effect with respect to the Company. The Merger Agreement also contains certain termination rights for both ALLETE and Alloy Parent, including if the Merger is not consummated by August 5, 2025 (subject to extension for an additional two successive three-month periods if all of the conditions to closing, other than the conditions related to obtaining regulatory approvals, have been satisfied). While the shareholders of ALLETE voted to approve and adopt the Merger Agreement and approve the transactions contemplated thereby, including the Merger, at a special meeting of the shareholders that was held on August 21, 2024, there can be no assurance that the other conditions to completion of the Merger will be satisfied or waived or that other events will not intervene to delay or result in the failure to close the proposed Merger. The Merger Agreement also provides for certain termination rights for each of ALLETE and Alloy Parent. If the Merger Agreement is terminated, there may be various material, adverse consequences to the Company, including that the Company could be required to pay Alloy Parent a termination fee of $116 million under certain specified circumstances. If the Merger is not completed or delayed, there may be negative reactions from the financial markets, including declines in the price of ALLETE’s common stock due to the fact that the current price may reflect a market assumption that the Merger will be completed.
The announcement and pendency of the Merger, during which the Company is subject to certain operating restrictions, could have an adverse effect on the Company’s businesses, results of operations, financial condition or cash flows.
The announcement and pendency of the Merger could disrupt the Company’s businesses, and uncertainty about the effect of the Merger may have an adverse effect on the Company. These uncertainties could affect existing employee relationships, disrupt the business of the Company, and could cause suppliers, vendors, partners, lenders and others that deal with the Company to: (1) defer entering into contracts with the Company; or (2) make other decisions concerning the Company or seek to change or cancel existing business relationships with the Company.
The Merger Agreement also requires the Company to obtain Parent’s consent prior to taking certain specified actions while the Merger is pending. These restrictions may prevent the Company from pursuing otherwise attractive business opportunities or making other changes to its business prior to the completion of the Merger.
The Company will incur substantial transaction fees and costs in connection with the Merger.
The Company has incurred transaction costs of $22.6 million after-tax through December 31, 2024, and expects to incur additional material expenses in connection with the Merger and completion of the transactions contemplated by the Merger Agreement. Further, even if the proposed Merger is not completed, the Company will need to pay certain costs relating to the proposed Merger incurred prior to the date the proposed Merger was abandoned, such as legal, accounting, financial advisory, filing and printing fees.
ALLETE, Inc. 2024 Form 10-K
Item 1A. Risk Factors (Continued)
Risks Relating to the Merger (Continued)
Pending litigation related to the Merger could result in substantial costs and may delay or prevent the Merger from being completed.
Securities class action lawsuits and derivative lawsuits are often brought against companies that have entered into merger agreements. Even if the lawsuits are without merit, defendingagainst these claims can result in substantial costs to us and divert management time and resources. Additionally, if a plaintiff is successful in obtaining an injunction prohibiting consummation of the Merger, then that injunction may delay or prevent the Merger from being completed. A complaint has been filed in the U.S. District Court for the Southern District of New York allegingviolation of Sections 14(a) and 20(a) of the Securities Exchange Act of 1934, disclosure deficiency in the Preliminary Proxy, and seeking to enjoin the transaction until certain disclosures are corrected. On September 3, 2024, that complaint was voluntarily dismissed without prejudice. Two additional complaints were filed on August 6, 2024, and August 7, 2024, in New York State Supreme Court, allegingnegligentmisrepresentation and negligence related to allegeddeficiencies in the Preliminary Proxy. Those complaints have not been served on any defendant. The Company believes that the complaints are without merit.
ALLETE Clean Energy focuses on developing, acquiring, and operating clean and renewable energy projects. ALLETE Clean Energy currently owns, operates, or has developed more than 1,600 megawatts of wind energy generation in five major energy markets and eight states across the U.S. with a majority contracted under PSAs of various durations. In addition, ALLETE Clean Energy engages in the development of wind energy facilities to operate under long-term PSAs or for sale to others upon completion.
Corporate and Other is comprised of New Energy, a renewable development company; our investment in Nobles 2, an entity that owns and operates a 250 MW wind energy facility in southwestern Minnesota; South Shore Energy, our non-rate regulated, Wisconsin subsidiary developing NTEC, an approximately 600 MW proposed combined-cycle natural gas-fired generating facility; BNI Energy, our coal mining operations in North Dakota; ALLETE Properties, our legacy Florida real estate investment; other business development and corporate expenditures; unallocated interest expense; a small amount of non-rate base generation; land holdings in Minnesota; and earnings on cash and investments.
ALLETE is incorporated under the laws of Minnesota. Our corporate headquarters are in Duluth, Minnesota. Statistical information is presented as of December 31, 2024, unless otherwise indicated. All subsidiaries are wholly-owned unless otherwise specifically indicated. References in this report to “we,” “us” and “our” are to ALLETE and its subsidiaries, collectively.
On May 5, 2024, ALLETE entered into the Merger Agreement. The Merger Agreement provides that, on and subject to the conditions set forth therein, Alloy Merger Sub will merge with and into ALLETE, with ALLETE continuing as the surviving corporation in the Merger and becoming a subsidiary of Alloy Parent. (See Note 15. Agreement and Plan of Merger.)
ALLETE, Inc. 2024 Form 10-K
2024 Financial Overview
The following net income discussion summarizes a comparison of the year ended December 31, 2024, to the year ended December 31, 2023.
Net income attributable to ALLETE in 2024 was $179.3 million, or $3.10 per diluted share, compared to $247.1 million, or $4.30 per diluted share, in 2023. Net income in 2024 includes transaction expenses of $22.6 million after-tax, or $0.39 per share, related to the Merger. (See Note 15. Agreement and Plan of Merger.) Net income in 2023 included transaction expenses of $3.6 million after-tax, or $0.06 per share, related to the Merger and a $40.5 million, or $0.71 per share, after-tax gain recognized for a favorable arbitration ruling involving a subsidiary of ALLETE Clean Energy. (See Note 9. Commitments, Guarantees and Contingencies.) Earnings per share dilution in 2024 was $0.02 due to additional shares of common stock outstanding in 2024 compared to 2023.
Regulated Operations net income attributable to ALLETE was $160.9 million in 2024, compared to $147.2 million in 2023. Net income at Minnesota Power was higher compared to 2023 reflecting the implementation of interim rates on January 1, 2024, net of reserves related to Minnesota Power’s rate case settlement (see Note 4. Regulatory Matters), and higher transmission margins, which were partially offset by higher depreciation and property tax expenses as well as lower margins from industrial customers. Net income at SWL&P was lower than 2023 primarily due to higher operating and maintenance expenses. Our after-tax equity earnings in ATC were higher than 2023 reflecting period over period changes in ATC’s estimate of a refund liability related to the FERC decision on MISO return on equity complaints in 2024. (See Note 6. Equity Investments.)
ALLETE Clean Energy net income attributable to ALLETE was $17.8 million in 2024 compared to $71.7 million in 2023. Net income in 2024 includes a $3.5 million after-tax gain on the sale of the Whitetail wind project. Net income in 2023 reflected a $44.3 million after-tax gain recognized for a favorable arbitration ruling involving a subsidiary of ALLETE Clean Energy. Net income in 2023 also included the gain on sale of the Red Barn project in 2023 of $4.3 million after-tax and higher interest income related to interest awarded as part of the arbitration ruling. Net income in 2024 and 2023 reflected a forcedoutage located near its Caddo wind energy facility beginning in the fourth quarter of 2023 through the second quarter of 2024 resulting in lower earnings.
Corporate and Other net income attributable to ALLETE was $0.6 million in 2024 compared to $28.2 million in 2023. Net income in 2024 includes transaction expenses of $22.6 million after-tax related to the Merger (See Note 15. Agreement and Plan of Merger), and also reflects lower earnings from Minnesota solar projects as investment tax credits were recognized in 2023 for the projects and lower earnings from ALLETE Properties reflecting fewer land sales in 2024 compared to 2023. Net income in 2023 reflects a $3.8 million after-tax expense for the consolidated income tax impact resulting from the gain on the favorable arbitration ruling. Net income at New Energy was $20.2 million in 2024 compared to $17.6 million in 2023.
2024 Compared to 2023
(See Note 14. Business Segments for financial results by segment.)
Regulated Operations
Year Ended December 31
Millions
Operating Revenue – Utility
Fuel, Purchased Power and Gas – Utility
Transmission Services – Utility
Operating and Maintenance
Depreciation and Amortization
Taxes Other than Income Taxes
Operating Income
Interest Expense
Equity Earnings
Other Income
Income Before Income Taxes
Income Tax Expense (Benefit)
Net Income Attributable to ALLETE
ALLETE, Inc. 2024 Form 10-K
2024 Compared to 2023 (Continued)
Regulated Operations (Continued)
Operating Revenue – Utility increased $4.4 million from 2023 primarily due to the implementation of interim rates, net of reserves, in 2024, and higher fuel adjustment clause recoveries. These increases were partially offset by lower transmission revenue, kWh sales and gas sales as well as a reduction related to the expected utilization of North Dakota investment tax credits.
Interim retail rates for Minnesota Power, subject to refund, were approved by the MPUC and became effective January 1, 2024, resulting in revenue of $41.1 million, net of reserves related to Minnesota Power’s rate case settlement and rider revenue incorporated into base rates. (See Note 4. Regulatory Matters.)
Fuel adjustment clause revenue increased $3.4 million due to higher fuel and purchased power costs attributable to retail and municipal customers. (See Fuel, Purchased Power and Gas – Utility.)
Lower kWh sales decreased revenue by $15.3 million from 2023 reflecting lower sales to residential, commercial and industrial customers as well as lower sales to other power suppliers. Sales to residential and commercial customers decreased from 2023 primarily due to milder weather in 2024 compared to 2023. Sales to industrial customers decreased primarily due to lower sales to taconite and pipeline customers, partially offset by higher sales to paper, pulp and secondary wood product customers. Sales to other power suppliers, which are sold at market-based prices into the MISO market on a daily basis or through PSAs of various durations, decreased reflecting fewer market sales, partially offset by higher market prices in 2024 compared to 2023.
Kilowatt-hours Sold
Quantity
Variance
Variance
Millions
Regulated Utility
Retail and Municipal
Residential
Commercial
Industrial
Municipal
Total Retail and Municipal
Other Power Suppliers
Total Regulated Utility Kilowatt-hours Sold
Revenue from electric sales to taconite and mining customers accounted for 32 percent of regulated operating revenue in 2024 (32 percent in 2023). Revenue from electric sales to paper, pulp and secondary wood product customers accounted for 5 percent of regulated operating revenue in 2024 (5 percent in 2023). Revenue from electric sales to pipelines and other industrial customers accounted for 11 percent of regulated operating revenue in 2024 (11 percent in 2023).
Transmission revenue decreased $13.8 million primarily due to lower MISO-related revenue. Transmission revenue in 2024 included the refund of MISO transmission payments that were over collected during 2023. (See Transmission Services – Utility) .
Cost recovery rider revenue decreased by $8.1 million from 2023 due to period over period changes in the estimate of North Dakota investment tax credits expected to be utilized by Minnesota Power. If the estimate of North Dakota investment tax credits expected to be utilized by Minnesota Power increases, an income tax benefit is recognized and a corresponding decrease in revenue is recognized to offset the impact of higher North Dakota investment tax credits on income tax expense.
Revenue from gas sales at SWL&P decreased $3.7 million reflecting fewer gas sales resulting from warmer winter weather and lower gas prices in 2024 compared to 2023. (See Fuel, Purchased Power and Gas – Utility.)
ALLETE, Inc. 2024 Form 10-K
2024 Compared to 2023 (Continued)
Regulated Operations (Continued)
Operating Expenses decreased $0.2 million from 2023.
Fuel, Purchased Power and Gas – Utility expense decreased $4.6 million, or 1 percent, from 2023 primarily due to lower kWh sales as well as lower gas sales and prices. These decreases were partially offset by less company-owned generation in 2024 compared to 2023 resulting in more sales being supplied through higher cost purchased power.
Transmission Services – Utility expense decreased $23.6 million, or 27 percent, from 2023 primarily due to lower MISO-related expense. Transmission Services – Utility expense in 2024 included the refund of MISO transmission payments that were over billed during 2023. (See Operating Revenue – Utility) .
Operating and Maintenance expense increased $2.9 million, or 1 percent, from 2023 primarily due to higher salaries and wages, benefit costs, and contract and professional services. These increases were partially offset by a reduction to expense for liquidateddamages related to contractor underperformance under a maintenance agreement.
Depreciation and Amortization expense increased $17.1 million, or 10 percent, from 2023 primarily due to the impact of estimated compliance costs related to the EPA’s CCR Legacy Impoundment Rule finalized in May 2024 and a higher plant in service balance in 2024.
Taxes Other than Income Taxes increased $8.0 million, or 18 percent, from 2023 primarily due to higher property tax expense. Property tax expense in 2023 included the favorable impact of an updated estimate for 2022 property tax expense recorded in 2023.
Interest Expense increased $2.2 million, or 3 percent, from 2023 primarily due to higher interest rates and interest on Minnesota Power’s reserve for interim rate refunds in 2024.
Equity Earnings increased $3.4 million, or 15 percent, from 2023 primarily due to period over period changes in ATC’s estimate of a refund liability related to the FERC decision on MISO return on equity complaints in 2024. (See Note 6. Equity Investments.)
Other Income increased $3.1 million from 2023 reflecting lower pension and other postretirement benefit plan non-service costs.
Income Tax Expense decreased $4.8 million from 2023. This is primarily due to the updated expected future use of North Dakota investment tax credits.
ALLETE, Inc. 2024 Form 10-K
2024 Compared to 2023 (Continued)
ALLETE Clean Energy
Year Ended December 31
Millions
Operating Revenue
Contracts with Customers – Non-utility
Other – Non-utility (a)
Cost of Sales – Non-utility
Operating and Maintenance
Depreciation and Amortization
Taxes Other than Income Taxes
Operating Loss
Interest Expense
Other Income (b)
Income (Loss) Before Income Taxes
Income Tax Expense (Benefit)
Net Income (Loss)
Net Loss Attributable to Non-Controlling Interest (b)
Net Income Attributable to ALLETE
(a) Represents non-cash amortization of differences between contract prices and estimated market prices on assumed PSAs.
(b) See Note 1. Operations and Significant Accounting Policies.
Operating Revenue decreased $334.2 million from 2023 primarily due to the sales of ALLETE Clean Energy’s Northern Wind and Red Barn projects in 2023, partially offset by the sale of ALLETE Clean Energy’s Whitetail wind project in 2024. In addition, operating revenue in 2024 was negatively impacted by a network outage located near Caddo. The network outage began in the fourth quarter of 2023 resulting from a forcedoutage of a substation and the transmission lines feeding that substation. This forcedoutage increased congestion experienced by Caddo resulting in lower kWh sales and pricing. The forcedoutage was resolved in June 2024. (See Outlook - ALLETE Clean Energy.)
Year Ended December 31,
Production and Operating Revenue
kWh
Revenue
kWh
Revenue
Millions
Wind Energy Regions
East
Midwest
South
West
Total Wind Energy Facilities
Sale of Wind Energy Facility
Total Production and Operating Revenue
ALLETE, Inc. 2024 Form 10-K
2024 Compared to 2023 (Continued)
ALLETE Clean Energy (Continued)
Cost of Sales - Non-utility decreased $323.9 million from 2023 primarily due to the sales of ALLETE Clean Energy’s Northern Wind and Red Barn projects, partially offset by the sale of ALLETE Clean Energy’s Whitetail wind project.
Operating and Maintenance expense decreased $5.6 million, or 11 percent, from 2023 primarily due to business interruption insurance proceeds at Diamond Spring in 2024 related to a transformer outage in the first half of 2024.
Other Income decreased $60.5 million from 2023 primarily due to a $58.4 million gain recognized for a favorable arbitration ruling in 2023 involving a subsidiary of ALLETE Clean Energy and higher interest income related to $5.1 million of interest awarded as part of the favorable arbitration ruling. (See Note 6. Commitments, Guarantees, and Contingencies.)
Income Tax Expense decreased $18.3 million from 2023 primarily due to lower pre-tax income in 2024 compared to 2023.
Net Loss Attributable to Non-Controlling Interest decreased $7.1 million from 2023 reflecting lower availability at ALLETE Clean Energy’s tax equity financed wind energy facilities resulting from the impacts of a network outage near Caddo and a transformer outage at Diamond Spring. This decrease was partially offset by a higher production tax credit rate, as determined by the Internal Revenue Service, in 2024 compared to 2023.
Corporate and Other
Operating Revenue decreased $20.2 million, or 9 percent, from 2023 reflecting lower revenue from New Energy and lower revenue from ALLETE Properties reflecting fewer land sales in 2024 compared to 2023.
Net Income Attributable to ALLETE was $0.6 million in 2024 compared to $28.2 million in 2023. Net income in 2024 includes transaction expenses of $22.6 million after-tax related to the Merger (See Note 15. Agreement and Plan of Merger), and also reflects lower earnings from Minnesota solar projects as investment tax credits were recognized in 2023 for the projects and lower earnings from ALLETE Properties reflecting fewer land sales in 2024 compared to 2023. Net income in 2023 reflects a $3.8 million after-tax expense for the consolidated income tax impact resulting from the gain on the favorable arbitration ruling. Net income at New Energy was $20.2 million in 2024 compared to $17.6 million in 2023.
Income Taxes – Consolidated
For the year ended December 31, 2024, the effective tax rate was an expense of 3.7 percent (expense of 13.5 percent for the year ended December 31, 2023). The lower effective tax rate for 2024 is primarily due to lower pre-tax income. (See Note 11. Income Tax Expense.)
2023 Compared to 2022
The comparison of the results of operations for the years ended December 31, 2023 and 2022, is included in Management's Discussion in the Annual Report on Form 10-K for the year ended December 31, 2023.
ALLETE, Inc. 2024 Form 10-K
Critical Accounting Policies
The preparation of financial statements and related disclosures in conformity with GAAP requires management to make various estimates and assumptions that affect amounts reported in the Consolidated Financial Statements. These estimates and assumptions may be revised, which may have a material effect on the Consolidated Financial Statements. Actual results may differ from these estimates and assumptions. These policies are discussed with the Audit Committee of our Board of Directors on a regular basis. We believe the following policies are most critical to our business and the understanding of our results of operations.
Regulatory Accounting. Our regulated utility operations are subject to accounting standards for the effects of certain types of regulation. These standards require us to reflect the effect of regulatory decisions in our financial statements. Regulatory assets represent incurred costs that have been deferred as they are probable for recovery in customer rates. Regulatory liabilities represent obligations to make refunds to customers and amounts collected in rates for which the related costs have not yet been incurred. The Company assesses quarterly whether regulatory assets and liabilities meet the criteria for probability of future recovery or deferral. This assessment considers factors such as, but not limited to, changes in the regulatory environment and recent rate orders to other regulated entities under the same jurisdiction. If future recovery or refund of costs becomes no longer probable, the assets and liabilities would be recognized in current period net income or other comprehensive income. (See Note 4. Regulatory Matters.)
Pension and Postretirement Health and Life Actuarial Assumptions. We account for our pension and other postretirement benefit obligations in accordance with the accounting standards for defined benefit pension and other postretirement plans. These standards require the use of several important assumptions, including the expected long-term rate of return on plan assets, the discount rate and mortality assumptions, among others, in determining our obligations and the annual cost of our pension and other postretirement benefits. In establishing the expected long-term rate of return on plan assets, we determine the long-term historical performance of each asset class and adjust these for current economic conditions while utilizing the target allocation of our plan assets to forecast the expected long-term rate of return. Our pension asset allocation as of December 31, 2024, was approximately 57 percent equity securities, 40 percent fixed income and 3 percent real estate. Our postretirement health and life asset allocation as of December 31, 2024, was approximately 67 percent equity securities, and 33 percent fixed income. Equity securities consist of a mix of market capitalization sizes with domestic and international securities. In 2024, we used weighted average expected long-term rates of return of 6.84 percent in our actuarial determination of our pension expense and 6.28 percent in our actuarial determination of our other postretirement expense. The actuarial determination uses an asset smoothing methodology for actual returns to reduce the volatility of varying investment performance over time. We review our expected long-term rate of return assumption annually and will adjust it to respond to changing market conditions. A one-quarter percent decrease in the expected long-term rate of return would increase the annual expense for pension and other postretirement benefits by approximately $2.1 million, pre-tax.
The discount rate is computed using a bond matching study which utilizes a portfolio of high quality bonds that produce cash flows similar to the projected costs of our pension and other postretirement plans. In 2024, we used weighted average discount rates of 5.38 percent and 5.42 percent in our actuarial determination of our pension and other postretirement expense, respectively. We review our discount rates annually and will adjust them to respond to changing market conditions. A one-quarter percent decrease in the discount rate would increase the annual expense for pension and other postretirement benefits by approximately $0.2 million, pre-tax.
The mortality assumptions used to calculate our pension and other postretirement benefit obligations as of December 31, 2024, considered a modified PRI-2012 mortality table and MP-2021 mortality projection scale. (See Note 12. Pension and Other Postretirement Benefit Plans.)
Valuation of Business Combinations and Resulting Goodwill. When we acquire a business, the assets acquired and liabilities assumed are recorded at their respective fair values as of the acquisition date. Determining the fair value of intangible assets acquired as part of a business combination requires us to make significant estimates. These estimates may include the amount and timing of projected future cash flows, the discount rate used to discount those cash flows to present value, the assessment of the asset’s life cycle, and the consideration of legal, technical, regulatory, economic and competitive risks.
ALLETE, Inc. 2024 Form 10-K
Critical Accounting Policies (Continued)
Goodwill. Goodwill is the excess of the purchase price (consideration transferred) over the estimated fair value of the net assets of the acquired businesses. In accordance with GAAP, goodwill is not amortized. The Company assesses whether there has been an impairment of goodwill annually in the fourth quarter and whenever an event occurs or circumstances change that would indicate the carrying amount may be impaired. Impairment testing for goodwill is done at the reporting unit level. An impairmentloss is recognized when the carrying amount of the reporting unit’s net assets exceeds the estimated fair value of the reporting unit. The test for impairment requires us to make several estimates about fair value, most of which are based on projected future cash flows. Our estimates associated with the goodwill impairment test are considered critical due to the amount of goodwill recorded on our Consolidated Balance Sheet and the judgment required in determining fair value. The fair value of the New Energy reporting unit was determined using a discounted cash flow model, using significant assumptions which included a discount rate of 12.5 percent, cash flow forecasts through 2033, gross margins, and a terminal growth rate of 3.5 percent. Any forecast contains a degree of uncertainty, and changes in the forecasted cash flows and other assumptions could significantly increase or decrease the calculated fair value of New Energy. The results of our annual impairment test are discussed in Note 1. Operations and Significant Accounting Policies and Note 7. Fair Value in this Form 10-K. Goodwill was $154.9 million as of December 31, 2024.
Impairment of Long-Lived Assets. We review our long-lived assets for indicators of impairment in accordance with the accounting standards for property, plant and equipment on a quarterly basis.
In accordance with the accounting standards for property, plant and equipment, if indicators of impairment exist, we test our long-lived assets for recoverability by comparing the carrying amount of the asset to the undiscounted future net cash flows expected to be generated by the asset. Cash flows are assessed at the lowest level of identifiable cash flows. The undiscounted future net cash flows are impacted by trends and factors known to us at the time they are calculated and our expectations related to: management’s best estimate of future sales prices; holding period and timing of sales; method of disposition; and future expenditures necessary to maintain the operations. (See Note 1. Operations and Significant Accounting Policies.)
Taxation. We are required to make judgments regarding the potential tax effects of various financial transactions and our ongoing operations to estimate our obligations to taxing authorities. These tax obligations include income taxes and taxes other than income taxes. Judgments related to income taxes require the recognition in our financial statements of the largest tax benefit of a tax position that is “more-likely-than-not” to be sustained on audit. Tax positions that do not meet the “more-likely-than-not” criteria are reflected as a tax liability in accordance with the accounting standards for uncertainty in income taxes. We record a valuation allowance against our deferred tax assets to the extent it is more-likely-than-not that some portion or all of the deferred tax assets will not be realized.
We are subject to income taxes in various jurisdictions. We make assumptions and judgments each reporting period to estimate our income tax assets, liabilities, benefits and expenses. Judgments and assumptions are supported by historical data and reasonable projections. Our assumptions and judgments include the application of tax statutes and regulations, and projections of future federal taxable income, state taxable income, and state apportionment to determine our ability to utilize NOL and credit carryforwards prior to their expiration. Significant changes in assumptions regarding future federal and state taxable income or a change in tax rates could require new or increased valuation allowances which could result in a material impact on our results of operations.
ALLETE, Inc. 2024 Form 10-K
Outlook
ALLETE is an energy company committed to earning a financial return that rewards our shareholders, allows for reinvestment in our businesses, and sustains growth. The Company has a long-term objective of achieving consolidated earnings per share growth within a range of 5 percent to 7 percent.
ALLETE is predominately a regulated utility through Minnesota Power, SWL&P, and an investment in ATC. ALLETE’s strategy is to remain predominately a regulated utility while investing in ALLETE Clean Energy, New Energy and its Corporate and Other businesses to complement its regulated businesses, balance exposure to the utility’s industrial customers, and provide potential long-term earnings growth. ALLETE expects net income from Regulated Operations to be approximately 75 percent of total consolidated net income in 2025. ALLETE expects its businesses to generally provide regulated, contracted or recurring revenues, and to support sustained growth in net income and cash flow.
In August 2022, the Inflation Reduction Act was signed into law. We believe our businesses will benefit from certain provisions of this law including from the extension and transferability of production tax credits and investment tax credits, among others. We have sold certain tax credits generated in 2023 and 2024, and we plan to continue selling certain tax credits generated in 2025 and beyond. We do not currently anticipate any impact from the new alternative minimum tax. We will continue to assess the impact of the law as additional implementation guidance becomes available and monitor any changes related to new public policies.
Minnesota Carbon-Free Legislation. On February 7, 2023, the Minnesota Governor signed a law that updated the state’s renewable energy standard and requires Minnesota electric utilities to source retail sales with 100 percent carbon-free energy by 2040. The law increases the renewable energy standard from 25 percent renewable by 2025 to 55 percent renewable by 2035, and requires investor-owned Minnesota utilities to provide 80 percent carbon-free energy by 2030, 90 percent carbon-free energy by 2035 and 100 percent carbon-free energy by 2040. The law utilizes renewable energy credits as the means to demonstrate compliance with both the carbon-free and renewable standards, includes an off-ramp provision that enables the MPUC to protect reliability and customer costs through modification or delay of either the renewable energy standard, the carbon-free standard, or both, and streamlines development and construction of wind energy projects and transmission in Minnesota. Ongoing progress towards compliance with Minnesota's Carbon Free Standard is evaluated in the IRP proceedings at the MPUC. Minnesota Power's next IRP will be filed in March 2025 and discuss progress towards compliance with the 2040 law.
Regulated Operations. Minnesota Power’s long-term strategy is to be the leading electric energy provider in northeastern Minnesota by providing safe, reliable and cost-competitive electric energy, while complying with environmental permit conditions and renewable energy requirements. Keeping the cost of energy production competitive enables Minnesota Power to effectively compete in the wholesale power markets and minimizes retail rate increases to help maintain customer viability. As part of maintaining cost competitiveness, Minnesota Power intends to reduce its exposure to possible future carbon and GHG legislation by reshaping its generation portfolio, over time, to reduce its reliance on coal. Minnesota Power is making significant progress toward 100 percent carbon-free energy supply. (See EnergyForward .) We will monitor and review proposed environmental regulations and may challenge those that add considerable cost with limited environmental benefit. Minnesota Power will continue to pursue customer growth opportunities and cost recovery rider approvals for transmission, renewable and environmental investments, as well as work with regulators to earn a fair rate of return.
ALLETE, Inc. 2024 Form 10-K
Outlook (Continued)
Regulatory Matters. Entities within our Regulated Operations segment are under the jurisdiction of the MPUC, FERC, PSCW and NDPSC. See Note 4. Regulatory Matters for discussion of regulatory matters within these jurisdictions.
2024 Minnesota General Rate Case. On November 1, 2023, Minnesota Power filed a retail rate increase request with the MPUC seeking an average increase of approximately 12.00 percent for retail customers, net of rider revenue incorporated into base rates. The rate filing sought a return on equity of 10.30 percent and a 53.00 percent equity ratio. On an annualized basis, the requested final rate increase would have generated approximately $89 million in additional revenue. In separate orders dated December 19, 2023, the MPUC accepted the filing as complete and approved an annual interim rate increase of approximately $64 million, net of rider revenue, beginning January 1, 2024, subject to refund.
On May 3, 2024, Minnesota Power entered into a settlement agreement with the Minnesota Department of Commerce, Minnesota Office of the Attorney General, Residential Utilities Division, and Large Power Intervenors to settle the retail rate increase request. As part of the settlement agreement, the parties agreed on all issues, including an overall rate increase of $33.97 million, net of rider revenue and amounts transferring to the fuel adjustment clause, a return on equity of 9.78 percent, an equity ratio of 53.00 percent, all non-financial items and cost allocation. In an order dated November 25, 2024, the MPUC approved the settlement agreement. Final rates are expected to be implemented in the first quarter of 2025; interim rates will be collected through this period with reserves recorded as necessary. As a result of the settlement, Minnesota Power recorded a reserve for an interim rate refund of $23.0 million pre-tax as of December 31, 2024, which is subject to MPUC approval of Minnesota Power’s refund calculation.
2022 Minnesota General Rate Case . Minnesota Power appealed with the Minnesota Court of Appeals (Court) specific aspects of the MPUC’s February 2023 and May 2023 rate case orders for the ratemaking treatment of Taconite Harbor and Minnesota Power’s prepaid pension asset. On September 9, 2024, the Court affirmed the MPUC’s Taconite Harbor treatment, but reversed and remanded the treatment of Minnesota Power’s prepaid pension asset back to the MPUC. The Court directed the MPUC to determine the amount of Minnesota Power’s prepaid pension asset to be included in rate base. The MPUC has not yet determined the next procedural steps in implementing the Court’s decision.
2024 Wisconsin General Rate Case. On March 29, 2024, SWL&P filed a rate increase request for its electric, gas and water utilities with the PSCW. The filing sought an overall return on equity of 10.00 percent and a 55.00 percent equity ratio. On an annualized basis, the requested change would increase rates by approximately 5.90 percent for retail customers and generate an estimated $7.3 million of additional revenue. In an order dated December 12, 2024, the PSCW approved an annual increase of approximately $5.5 million reflecting a return on equity of 9.80 percent and a 55.00 percent equity ratio. Final rates went into effect January 1, 2025.
ALLETE, Inc. 2024 Form 10-K
Outlook (Continued)
Industrial Customers. Electric power is one of several key inputs in the taconite mining, paper, pulp and secondary wood products, pipeline and other industries. Approximately 56 percent of our regulated utility kWh sales in 2024 (55 percent in 2023 and 52 percent in 2022) were made to our industrial customers. We expect industrial sales of approximately 6.9 million MWh in 2025 (7.0 million MWh in 2024 and 7.0 million MWh in 2023). (See Item 1. Business – Regulated Operations – Electric Sales / Customers.)
Taconite . Minnesota Power’s taconite customers are capable of producing up to approximately 41 million tons of taconite pellets annually. Taconite pellets produced in Minnesota are primarily shipped to North American steelmaking facilities that are part of the integrated steel industry, which continue to lead the world in environmental performance among steelmaking countries. According to the U.S. Department of Energy, steel production in the U.S. is the most energy efficient of any major steel producing country. Steel produced from these North American facilities is used primarily in the manufacture of automobiles, appliances, tubular applications for all industries, and in the construction industry. Steel is also a critical component of the clean energy transformation underway today. Meeting the demand for more renewable energy and the need for additional infrastructure to transport green energy from the point of generation to the end user both require steel. Historically, approximately 10 percent of Minnesota taconite production has been exported outside of North America.
There has been a general historical correlation between U.S. steel production and Minnesota taconite production. The American Iron and Steel Institute, an association of North American steel producers, reported that U.S. raw steel production operated at approximately 76 percent of capacity in 2024 (75 percent in 2023 and 78 percent in 2022). The World Steel Association, an association of steel producers, national and regional steel industry associations, and steel research institutes representing approximately 85 percent of world steel production, projected U.S. steel consumption in 2025 will increase by approximately 2 percent compared to 2024.
Minnesota Power’s taconite customers may experience annual variations in production levels due to such factors as economic conditions, short-term demand changes or maintenance outages. The Minnesota Department of Revenue Mineral Tax Office expects taconite production from our taconite customers to be approximately 34 million tons in 2025. We estimate that a one million ton change in Minnesota Power’s taconite customers’ production would impact our annual earnings per share by approximately $0.07, net of expected power marketing sales at current prices. Changes in wholesale electric prices or customer contractual demand nominations could impact this estimate. Minnesota Power proactively sells power in the wholesale power markets that is temporarily not required by industrial customers to optimize the value of its generating facilities. Long-term reductions in taconite production or a permanent shut down of a taconite customer may lead Minnesota Power to file a general rate case to recover lost revenue.
USS Corporation . USS Corporation completed a $150 million investment to produce direct reduced-grade (DR-grade) pellets at its Keetac plant in late 2023. USS Corporation broke ground on the project in the third quarter of 2022, and confirmed the first shipment of DR-grade pellets in 2024. This investment enables the existing pelletizing plant to not only create DR-grade pellets for use as a feedstock for a direct reduced iron (DRI) or hot briquetted iron (HBI) process that ultimately supplies electric arc furnace steelmaking but also maintains the optionality to continue producing blast furnace-grade pellets. USS Corporation’s Minntac and Keetac plants are Large Power industrial customers of Minnesota Power. USS Corporation has the capability to annually produce approximately 15 million tons of blast furnace-grade pellets at its Minntac plant and 5 million tons of blast-furnace grade pellets, or 4 million tons of DR-grade pellets, at its Keetac plant.
On December 18, 2023, USS Corporation announced it entered into a definitive agreement in which Nippon Steel will acquire all of the shares of USS Corporation. USS Corporation expected the transaction to close by the end of 2024, subject to regulatory approvals, at which time USS Corporation stated it will continue to operate under the U.S. Steel brand name and will maintain its headquarters in Pittsburgh, Pennsylvania. On January 3, 2025, President Biden issued an order blocking the transaction, a decision currently being challenged in court.
On January 27, 2025, USS Corporation exercised its rights under its electric service agreement with Minnesota Power to provide a four-year notice of termination. Minnesota Power and USS Corporation are working together to meet USS Corporation’s evolving energy needs. Absent any other action by the parties, the termination of the current electric service agreement would be effective January 27, 2029, and USS Corporation would become a non-contract large power customer of Minnesota Power.
ALLETE, Inc. 2024 Form 10-K
Outlook (Continued)
Industrial Customers (Continued)
Cleveland-Cliffs, Inc. (Cliffs) . Cliffs is the largest flat-rolled steel producer and the largest iron ore pellet producer in North America, and is also Minnesota Power’s largest customer. Its acquisition in 2020 of substantially all of the operations of ArcelorMittal USA LLC and its subsidiaries included ArcelorMittal’s Minorca mine in Virginia, Minnesota, and its ownership share of Hibbing Taconite in Hibbing, Minnesota, which are both large industrial customers of Minnesota Power. The acquisition increased customer concentration risk for the Company and could lead to further capacity consolidation for both steel blast furnaces and related Minnesota iron ore production. In 2024, Cliffs announced and completed an acquisition of Stelco Holdings, enhancing Cliffs’ position as the largest flat-rolled steel producer in North America, diversifying Cliffs’ end-markets, and expanding its geographical presence in Canada.
Northshore Mining . Cliffs idled all production at its Northshore mine in 2022, and subsequently resumed partial pellet plant production in April 2023. Cliffs indicated it will continue to utilize Northshore Mining as a swing facility. Northshore Mining has the capability to produce approximately 6 million tons annually. Minnesota Power has a PSA through 2031 with Silver Bay Power, which provides the majority of the electric service requirements for Northshore Mining.
Hibbing Taconite . Hibbing Taconite is a joint venture between subsidiaries of Cliffs (85.3 percent ownership) and USS Corporation (14.7 percent ownership). The joint venture is managed by Cliffs and is also a Large Power Customer of Minnesota Power. On May 25, 2023, the Minnesota Executive Council approved state mineral leases near Nashwauk, Minnesota, with Cliffs, the majority owner of Hibbing Taconite. Cliffs had stated that these leases would provide Hibbing Taconite with more than two decades of additional mineral reserves. In October of 2023, Mesabi Metallics issued a notice of termination of a private iron ore mineral lease agreement previously held by Cliffs, a decision that was affirmed in arbitration in 2024. Cliffs has stated that without these leases, the future of Hibbing Taconite is once again in question. Prior to the state mineral leases being awarded, Hibbing Taconite had proven mineral reserves to support its operations through 2026. Hibbing Taconite has the capability of producing 8 million tons of taconite annually.
Minnesota Sulfate Wild Rice Water Quality Standard . In April, 2021, the EPA identified rivers and lakes in Minnesota in which wild rice grows that have sulfate levels that exceed Minnesota’s sulfate limit for wild rice waters. In September, 2021, three additional wild rice waters with sulfate levels that exceed Minnesota’s sulfate limit were identified. The EPA directed the MPCA to add these rivers and lakes to its list of impaired waters which can be used to set limits in discharge permits for industrial activities such as mining. Minnesota Power’s taconite customers could be adversely impacted if they are required to significantly reduce sulfate discharges.
Paper, Pulp and Secondary Wood Products . The North American paper and pulp industry continues to face declining demand due to the impact of electronic substitution for print and changing customer needs. As a result, certain paper and pulp customers have reduced their existing operations in recent years and have pursued or are pursuing product changes in response to the declining demand. The resulting reduction in production capacity outside of Minnesota for certain paper grades has solidified our paper customers’ operations, at least for the near term, and as such we expect operating levels in 2025 at the major paper and pulp mills we serve to be at similar levels as in 2024.
Sofidel . ST Paper, a former Large Power Customer of Minnesota Power, sold its paper mill in Duluth, Minnesota to Sofidel, a privately held Italian multinational company, in the first quarter of 2024. In the third quarter of 2024, Sofidel announced plans to invest between $200 million and $250 million to add a conversion facility and automated warehouse to the tissue plant.
Pipeline and Other Industries.
Cenovus Energy . In 2023, Cenovus Energy announced that it had commenced a restart of the facility and resumed full operations in 2024 following a rebuild from a fire in 2018.
ALLETE, Inc. 2024 Form 10-K
Outlook (Continued)
EnergyForward. Minnesota Power is executing EnergyForward , its strategy assuring reliability, protecting affordability and further improving environmental performance. The plan includes completed and planned investments in wind, solar, natural gas and hydroelectric power, construction of additional transmission capacity, the installation of emissions control technology and the idling and retirement of certain coal-fired generating facilities. Minnesota Power has a vision to deliver 100 percent carbon-free energy to customers, continuing its commitment to climate, customers and communities through its EnergyForward strategy. This vision builds on Minnesota Power’s achievement in 2020 of providing 50 percent renewable energy to its customers. In 2023, the Minnesota Governor signed into law legislation that updates the state’s renewable energy standard and requires Minnesota electric utilities to source retail sales with 100 percent carbon-free energy by 2040. Minnesota Power is working with various stakeholders and participating in the regulatory process to implement this legislation. (See Item 1. Business – Regulated Operations – Minnesota Legislation.)
2021 IRP. In February 2021, Minnesota Power filed its latest IRP, which was approved by the MPUC in a January 2023. The approved IRP, which reflects a joint agreement reached with various stakeholders, outlines Minnesota Power’s clean-energy transition plans through 2035. These plans include expanding its renewable energy supply, achieving coal-free operations at its facilities by 2035, and investing in a resilient and flexible transmission and distribution grid. As part of these plans, Minnesota Power anticipates adding up to 700 MW of new wind and solar energy resources, and ceasing coal operations at Boswell Units 3 and 4 by 2030 and 2035, respectively. Minnesota Power’s plans recognize that advances in technology will play a significant role in completing its transition to carbon-free energy supply, reliably and affordably. Minnesota Power is expected to file its next IRP in March 2025.
In recent years, Minnesota Power has transformed its energy supply from more than a 95 percent reliance on coal to become a leader in the nation’s clean-energy transformation. Since 2013, the company has closed or converted seven of its nine coal-fired units and added nearly 900 megawatts of renewable energy sources. Additionally, Minnesota Power has been a leader in energy conservation, surpassing the state’s conservation goals each year for the past decade.
Nemadji Trail Energy Center. Minnesota Power has a natural gas capacity dedication and other affiliated interest agreements for NTEC, an approximately 600 MW proposed combined-cycle natural gas-fired generating facility to be built in Superior, Wisconsin, which will be jointly owned by Dairyland Power Cooperative, Basin and South Shore Energy, ALLETE’s non-rate regulated, Wisconsin subsidiary. Minnesota Power is expected to purchase approximately 20 percent of the facility's output starting upon the completion of the facility pursuant to the capacity dedication agreement.
Renewable Energy. Minnesota Power continues to execute its renewable energy strategy and is currently supplying 55 percent of its energy by renewable energy sources. Minnesota Power is also making significant progress toward 100 percent carbon-free energy supply. (See EnergyForward .)
Minnesota Power has approved cost recovery riders for certain renewable investments and expenditures as well as investments and expenditures related to compliance with the Minnesota Solar Energy Standard. The cost recovery riders allow Minnesota Power to charge retail customers on a current basis for the costs of certain renewable and solar investments and expenditures plus a return on the capital invested. (See Note 4. Regulatory Matters.)
Wind Energy . Minnesota Power’s wind energy facilities consist of Bison (497 MW) located in North Dakota, and Taconite Ridge (25 MW) located in northeastern Minnesota. Minnesota Power also has two long-term wind energy PPAs with an affiliate of NextEra Energy, Inc. to purchase the output from Oliver Wind I (50 MW) and Oliver Wind II (48 MW) located in North Dakota.
Minnesota Power uses the 465-mile, 250-kV DC transmission line that runs from Center, North Dakota, to Duluth, Minnesota, to transport wind energy from North Dakota while gradually phasing out coal-based electricity delivered to its system over this transmission line from Square Butte’s lignite coal-fired generating unit. Minnesota Power is currently pursuing a modernization and capacity upgrade of its DC transmission system to continue providing reliable operations and additional system capabilities. (See Transmission .)
Wind Energy Request For Proposals. On February 15, 2024, Minnesota Power issued a RFP for up to 400 MW of wind energy resources.
ALLETE, Inc. 2024 Form 10-K
Outlook (Continued)
EnergyForward (Continued)
Nobles 2 PPA . Minnesota Power has a long-term PPA with Nobles 2 that provides for Minnesota Power to purchase the energy and associated capacity from a 250 MW wind energy facility in southwestern Minnesota through 2040. The agreement provides for the purchase of output from the facility at fixed energy prices. There are no fixed capacity charges, and Minnesota Power will only pay for energy as it is delivered. (See Corporate and Other – Investment in Nobles 2 .)
Manitoba Hydro . Minnesota Power has two long-term PPAs with Manitoba Hydro. The first PPA provides for Minnesota Power to purchase 250 MW of capacity and energy from Manitoba Hydro through May 2035. The second PPA provides for Minnesota Power to purchase up to 133 MW of energy from Manitoba Hydro through June 2040. (See Note 9. Commitments, Guarantees and Contingencies.)
Solar Energy . Minnesota Power’s solar energy facilities consist of a 10 MW solar energy facility at the Camp Ripley Minnesota Army National Guard base and training facility near Little Falls, Minnesota, and a 40 kW solar array located in Duluth, Minnesota. Minnesota Power also purchases solar energy from approximately 20 MW of solar energy facilities located in Minnesota that are owned by an ALLETE subsidiary, and a 1 MW community solar garden in northeastern Minnesota, which is owned and operated by a third party. SWL&P owns and operates a 470 kW solar array as part of a community solar garden in Superior, Wisconsin, that went into service in 2023.
Solar Energy Request For Proposals. On November 15, 2023, Minnesota Power issued a RFP for up to 300 MW of solar energy resources, which were accepted through January 17, 2024. On September 23, 2024, Minnesota Power announced plans to build an 85 MW solar project and a 119.5 MW solar project in northern Minnesota, both of which are expected to be in service in mid-2027, subject to MPUC approval.
Distributed Solar Energy Request for Proposals. On January 30, 2025, Minnesota Power issued a RFP seeking distributed solar projects as part of its compliance with Minnesota’s distributed solar energy standard. The RFP seeks proposals for solar generating facilities of 10 MW or less that will be connected to Minnesota Power’s distribution system.
Transmission . We continue to make investments in transmission opportunities that strengthen or enhance the transmission grid or take advantage of our geographical location between sources of renewable energy and end users. These include investments to enhance our own transmission facilities and investments in other transmission assets (individually or in combination with others) and our investment in ATC. See also Item 1. Business – Regulated Operations – Transmission and Distribution.
North Plains Connector Development Agreement. In December 2023, ALLETE and Grid United LLC, an independent transmission company, signed development agreements for the North Plains Connector project. The project is a new, approximately 400-mile high-voltage direct-current (HVDC) transmission line from central North Dakota, to Colstrip, Montana that will be the first transmission connection between three regional U.S. electric energy markets: MISO, the Western Interconnection and the Southwest Power Pool. This new link, open to all sources of electric generation, would create 3,000 MW of transfer capacity between the middle of the country and the West Coast, easing congestion on the transmission system, increasing resiliency and reliability in all three energy markets, and enabling fast sharing of renewable energy across a vast area with diverse weather patterns. The project capital cost is expected to be approximately $3.2 billion. On August 6, 2024, the U.S. Department of Energy awarded a $700 million grant to the project. ALLETE expects to pursue up to 35 percent ownership and will be positioned to oversee the line’s operation. The companies began project permitting in 2023 as they work toward a planned in-service date as early as 2032, pending regulatory and other necessary approvals.
Duluth Loop Reliability Project . In October 2021, Minnesota Power submitted an application for a certificate of need for the Duluth Loop Reliability Project. This transmission project was proposed to enhance reliability in and around Duluth, Minnesota. The project includes the construction of a new 115-kV transmission line; construction of an approximately one-mile extension of an existing 230-kV transmission line; and upgrades to several substations. A certificate of need was granted and a route permit was issued by the MPUC on April 3, 2023. The Duluth Loop Reliability Project is expected to be completed and in service by late 2026 to early 2027, with an estimated cost of $50 million to $70 million.
ALLETE, Inc. 2024 Form 10-K
Outlook (Continued)
Transmission (Continued)
HVDC Transmission System Project. On June 1, 2023, Minnesota Power submitted an application for a certificate of need and route permit with the MPUC to replace aging critical infrastructure and modernize the terminal stations of its HVDC transmission line. In an October 25, 2024, order, the MPUC approved the certificate of need and route permit. Minnesota Power uses the 465-mile, 250-kV HVDC transmission line that runs from Center, North Dakota, to Duluth, Minnesota, to transport wind energy from North Dakota while gradually phasing out coal-based electricity delivered to its system over this transmission line from Square Butte’s lignite coal-fired generating unit. The HVDC transmission system project is expected to improve reliability of the transmission system, improve system resiliency, expand the operating capacity of the HVDC terminals, and replace critical infrastructure. Construction on the Minnesota end of the project will begin in early 2025. Construction on the North Dakota end of the project will begin later in 2025, pending regulatory approvals in North Dakota. The project will be placed in-service between 2028 and 2030. The project is estimated to cost between $800 million and $940 million. On October 18, 2023, the U.S. Department of Energy awarded a $50 million grant to Minnesota Power for this project, which will be used to prepare the HVDC transmission system for future expansion and help reduce project costs to customers. In addition, this project was awarded $15 million in state funding as part of an energy and climate budget bill passed by the Minnesota Legislature in 2023. Further, Minnesota Power’s application to the Minnesota Department of Commerce (DOC) State Competitiveness Fund Match Program received notification the DOC is reserving $10 million as a cost share for the project. In total, Minnesota Power has been awarded $75 million in federal and state dollars in support of the project.
Northland Reliability Project. Minnesota Power and Great River Energy announced in July 2022 their intent to build a 150-mile, 345-kV transmission line, connecting northern Minnesota to central Minnesota to support continued reliability in the Upper Midwest. Great River Energy, a wholesale electric power cooperative, and Minnesota Power filed a Notice of Intent to Construct, Own and Maintain the transmission line with the MPUC in August 2022. This joint project is part of a portfolio of transmission projects approved in July 2022 by MISO as part of the first phase of its Long Range Transmission Plan. Planning for the approximately $970 million to $1,350 million transmission line is in its early stages with the route anticipated to generally follow existing rights of way in an established power line corridor. The MPUC will determine the final route as well as cost recovery for Minnesota Power’s approximately 50 percent estimated share of the project. On August 4, 2023, Minnesota Power and Great River Energy submitted an application for a certificate of need and route permit with the MPUC, which were approved by the MPUC at a hearing on January 23, 2025. On May 10, 2024, the FERC approved Minnesota Power's request to recover on construction work in progress related to this project from Minnesota Power’s wholesale customers. Subject to regulatory approvals, the transmission line is expected to be in service in 2030.
Big Stone South – Alexandria – Big Oaks Transmission Project. Northern States Power, Great River Energy, Minnesota Power, Otter Tail Power Company, and Missouri River Energy Resources (Project Developers) announced in July 2022 their intent to build a 150-mile, 345-kV transmission line to improve reliability in North Dakota, South Dakota, and western and central Minnesota. This joint project is part of a portfolio of transmission projects approved in July 2022 by MISO as part of the first phase of its Long Range Transmission Plan. A Notice of Intent to Construct, Own and Maintain the transmission line was filed with the MPUC in October 2022. On September 29, 2023, the Project Developers submitted an application for a certificate of need and route permit with the MPUC, which was approved on October 3, 2024. The project is in its early stages and is expected to cost between $600 million and $700 million. Minnesota Power has asset ownership in the Alexandria – Big Oaks portion of the project, with start of construction following the certificate of need approval on October 3, 2024. Minnesota Power is a 16.5 percent owner of this portion of the project and will invest at this level for the entire portion of the project. On May 10, 2024, the FERC approved Minnesota Power's request to recover on construction work in progress related to this project from Minnesota Power’s wholesale customers. The Minnesota Power portion of this transmission line is expected to be in service in 2027.
Second Phase of MISO Long Range Transmission Plan. Minnesota Power and SWL&P are participating in several projects identified in the second phase of the MISO Long Range Transmission Plan that was approved on December 12, 2024, including the Bison – Alexandria 345kV project, the Maple River – Cuyuna 345kV project, the Iron Range – St Louis County – Arrowhead 345kV project, and the Stinson MSSSC project. Notices of Intent to Construct, Own and Maintain the Bison – Alexandria 345kV project, the Maple River – Cuyuna 345 kV project, and the Iron Range – St Louis County – Arrowhead 345kV project were filed with the MPUC on February 7, 2025.
Bison – Alexandria 345kV project . This transmission line is closely related to the Alexandria – Big Oaks line noted previously and is anticipated to have the same ownership structure. MISO found that this project along with others in northern Minnesota provide outlets for generation from the west, supports large power transfers to load centers, and reduces congestion. The project in total is estimated to cost over $200 million and is expected to be completed by 2032.
ALLETE, Inc. 2024 Form 10-K
Outlook (Continued)
Transmission (Continued)
Maple River – Cuyuna 345 kV project . This transmission line is a new, 166-mile 345-kV circuit that will connect the Maple River Substation near Fargo, ND to the Cuyuna Series Compensation Station near Riverton, MN. Minnesota Power is the owner of the Cuyuna Series Compensation Station in Minnesota, which is being constructed as part of the Northland Reliability Project, a joint project with Great River Energy. Otter Tail Power Company is the owner of the Maple River Substation in North Dakota. The project in total is estimated to cost approximately $910 million and is expected to be completed by 2033.
Iron Range – St. Louis County – Arrowhead 345kV project . This transmission line is a new, 63-mile 345-kV circuit that will connect the Iron Range Substation near Grand Rapids, MN to the St. Louis County Substation near Hermantown, MN, and then to the Arrowhead 345 kV Substation, also near Hermantown, MN. Minnesota Power is the owner of the Iron Range and St. Louis County substations. ATC is the owner of the Arrowhead 345 kV Substation. The project in total is estimated to cost approximately $370 million and is expected to be completed by 2032.
Stinson MSSSC project . This project involves modification and expansion of the existing Stinson Substation in Superior, Wisconsin to accommodate a new modular static synchronous series compensator (MSSSC) system and associated substation equipment. The MSSSC system is a type of grid-enhancing technology that will provide power flow capability to replace the existing Stinson phase shifting transformer. The project was identified as an underlying system improvement associated with LRTP Project #21 (Iron Range-St Louis County-Arrowhead Project) in the second phase of the MISO Long Range Transmission Plan that was approved on December 12, 2024. SWL&P is the owner of the Stinson Substation. The project is estimated to cost approximately $58 million and is expected to be completed by 2032.
Investment in ATC. ATC’s most recent 10-year transmission assessment, which covers the years 2024 through 2033, identifies a need for between $8.9 billion and $10.9 billion in transmission system investments. These investments by ATC, if undertaken, are expected to be funded through a combination of internally generated cash, debt and investor contributions. As opportunities arise, we plan to make additional investments in ATC through general capital calls based upon our pro rata ownership interest in ATC.
ALLETE Clean Energy
ALLETE Clean Energy will pursue growth through acquisitions or project development. ALLETE Clean Energy is targeting acquisitions of existing operating portfolios which have a mix of long-term PSAs in place and/or available for repowering and recontracting. Further, ALLETE Clean Energy will evaluate actions that will lead to the addition of complimentary clean energy products and services. At this time, ALLETE Clean Energy is focused on actions that will optimize its clean energy project portfolio of operating and development projects, which may include recontracting, repowering, entering into partnerships and divestitures along with continued acquisitions or development of new projects including wind, solar, energy storage or storage ready facilities across North America.
Portions of our ALLETE Clean Energy business are experiencing return pressures that are impacting our earnings per share growth from increased competition, congestion and lower forward price curves, as a growing amount of investment capital is being directed into wind generation opportunities. In addition, current and potential new project developments can be negatively affected by a lower ALLETE stock price, which may result in such projects not being accretive, or otherwise unable to satisfy our financial objectives criteria to proceed. In response to these market pressures, we are actively evaluating additional growth opportunities to deliver more comprehensive clean energy solutions for customers at ALLETE Clean Energy, which may include wind, solar, storage solutions, and related energy infrastructure investments and services. We believe that the energy industry is entering a new phase of growth and that we are well-positioned to serve customers and drive future growth at ALLETE. ALLETE Clean Energy will continue to optimize its existing wind energy facility portfolio, advance and expand its project pipeline, and explore other renewable energy opportunities to further enhance its service offerings, growth and profitability.
ALLETE Clean Energy manages risk by having a diverse portfolio of assets, which includes PSA expiration, technology and geographic diversity. The current operating portfolio is subject to typical variations in seasonal wind with higher wind resources typically available in the winter months. The majority of its planned maintenance leverages this seasonality and is performed during lower wind periods. ALLETE Clean Energy’s current operating portfolio is disclosed in Item 1. Business.
ALLETE, Inc. 2024 Form 10-K
Outlook (Continued)
Corporate and Other.
New Energy. New Energy is a renewable energy development company with a primary focus on solar and storage facilities while also offering comprehensive operations, maintenance and asset management services. New Energy is a leading developer of community, commercial and industrial, and small utility-scale renewable energy projects that has completed more than 575 MW in its history, totaling more than $1.4 billion of capital. New Energy currently has a robust project pipeline with greater than 2,000 MW of renewable projects in development across over 20 different states. New Energy adds value through cost effective development and economies of scale on project implementation, bringing national capabilities to regional co-development partners. New Energy is involved in greenfield development as well as acquiring and completing mid-stage and late-stage renewable energy projects. New Energy will continue its current strategy of developing, owning and operating renewable energy projects.
Investment in Nobles 2. Our subsidiary, ALLETE South Wind, owns a 49 percent equity interest in Nobles 2, the entity that owns and operates a 250 MW wind energy facility in southwestern Minnesota pursuant to a 20-year PPA with Minnesota Power. We account for our investment in Nobles 2 under the equity method of accounting. (See Note 6. Equity Investments.)
South Shore Energy. South Shore Energy, ALLETE’s non-rate regulated, Wisconsin subsidiary, is developing NTEC, an approximately 600 MW proposed combined-cycle natural gas-fired generating facility to be built in Superior, Wisconsin, which will be jointly owned by Dairyland Power Cooperative, Basin and South Shore Energy. Minnesota Power is expected to purchase approximately 20 percent of the facility's output starting upon completion of the facility pursuant to a capacity dedication agreement. Construction of NTEC is subject to obtaining additional permits from local, state and federal authorities. The total project cost is estimated to be approximately $700 million, of which South Shore Energy will be responsible for approximately 20 percent. South Shore Energy’s portion of NTEC project costs incurred through December 31, 2024, is approximately $10 million.
BNI Energy. In 2024, BNI Energy sold 3.8 million tons of coal (4.0 million tons in 2023) and anticipates 2025 sales will be similar to 2024. BNI Energy operates under cost-plus fixed fee agreements extending through December 31, 2037.
ALLETE Properties. Our strategy incorporates the possibility of a bulk sale of the entire ALLETE Properties portfolio. Proceeds from a bulk sale would be strategically deployed to support growth initiatives at our Regulated Operations and ALLETE Clean Energy. ALLETE Properties also continues to pursue sales of individual parcels over time and will continue to maintain key entitlements and infrastructure.
Income Taxes
ALLETE’s aggregate federal and multi-state statutory tax rate is approximately 28 percent for 2024. ALLETE also has tax credits and other tax adjustments that reduce the combined statutory rate to the effective tax rate. These tax credits and adjustments historically have included items such as production tax credits, excess deferred taxes, non-controlling interests in subsidiaries, as well as other items. The annual effective rate can also be impacted by such items as changes in income before income taxes, state and federal tax law changes that become effective during the year, business combinations, tax planning initiatives and resolution of prior years’ tax matters. We expect that our effective tax rate will be lower than the combined statutory rate over the next 5 to 10 years due to tax credits attributable to our wind and solar energy generation.
ALLETE, Inc. 2024 Form 10-K
Liquidity and Capital Resources
Liquidity Position. ALLETE is well-positioned to meet its liquidity needs. As of December 31, 2024, we had cash and cash equivalents of $32.8 million, $325.8 million in available consolidated lines of credit, 2.1 million original issue shares of common stock available for issuance through a distribution agreement with Lampert Capital Markets, the option (per the Merger Agreement) to request that Alloy Parent purchase up to a total of $300 million of preferred stock of ALLETE in the second half of 2025 (see Securities ), and a debt-to-capital ratio of 35 percent.
Capital Structure. ALLETE’s capital structure for each of the last three years is as follows:
As of December 31
Millions
ALLETE Equity
Non-Controlling Interest in Subsidiaries
Short-Term and Long-Term Debt (a)
Redeemable Non-Controlling Interest
(a) Excludes unamortized debt issuance costs.
Cash Flows. Selected information from ALLETE’s Consolidated Statement of Cash Flows is as follows:
Year Ended December 31
Millions
Cash, Cash Equivalents and Restricted Cash at Beginning of Period
Cash Flows from (used in)
Operating Activities
Investing Activities
Financing Activities
Change in Cash, Cash Equivalents and Restricted Cash
Cash, Cash Equivalents and Restricted Cash at End of Period
Operating Activities . Cash provided by operating activities was lower in 2024 compared to 2023 reflecting cash proceeds from the sales of ALLETE Clean Energy’s Northern Wind and Red Barn projects in 2023, cash received from the favorable arbitration award by a subsidiary of ALLETE Clean Energy in 2023, higher cash contributions to defined benefit pension in 2024, and timing of recovery under Minnesota Power’s fuel adjustment clause. These decreases were partially offset by proceeds from the sale of renewable tax credits in 2024.
Cash provided by operating activities was higher in 2023 compared to 2022 reflecting cash proceeds from the sales of ALLETE Clean Energy’s Northern Wind and Red Barn projects in 2023, cash received from the favorable arbitration award by a subsidiary of ALLETE Clean Energy in 2023, lower payments for inventories in 2023 related to the Northern Wind and Red Barn projects, and timing of recovery under Minnesota Power’s fuel adjustment clause. Cash provided by operating activities in 2023 also increased due to the timing of recovery under Minnesota Power’s fuel adjustment clause.
Investing Activities . Cash used in investing activities was higher in 2024 compared to 2023 reflecting more payments for additions to property, plant and equipment compared to 2023, partially offset by state cash grants received for our HVDC Transmission System Project in 2024. (See Outlook.)
Cash used in investing activities was lower in 2023 compared to 2022 reflecting cash payments for the acquisition of New Energy in 2022. This decrease was partially offset by more payments for additions to property, plant and equipment in 2023 compared to 2022.
Financing Activities . Cash used in financing activities was lower in 2024 compared to 2023 reflecting higher proceeds from the issuance of long-term debt compared in 2024, partially offset by higher repayments of long-term debt in 2024.
Cash used in financing activities in 2023 reflected lower proceeds from the issuance of common stock and the issuance of long-term debt, and lower proceeds from the issuance of non-controlling interest in subsidiaries compared to 2022.
ALLETE, Inc. 2024 Form 10-K
Liquidity and Capital Resources(Continued)
Working Capital . Additional working capital, if and when needed, generally is provided by consolidated bank lines of credit and the issuance of securities, including long-term debt, common stock and commercial paper. As of December 31, 2024, we had consolidated bank lines of credit aggregating $362.0 million ($423.1 million as of December 31, 2023), most of which expire in January 2027. We had $16.2 million outstanding in standby letters of credit and $20.0 million outstanding draws under our lines of credit as of December 31, 2024 ($19.4 million in standby letters of credit and $34.1 million outstanding draws as of December 31, 2023). We also have other credit facility agreements in place that provide the ability to issue up to $180.0 million in standby letters of credit. As of December 31, 2024, we had $118.4 million outstanding in standby letters of credit under these agreements.
In addition, as of December 31, 2024, we had 2.4 million original issue shares of our common stock available for issuance through Invest Direct and 2.1 million original issue shares of common stock available for issuance through a distribution agreement with Lampert Capital Markets. (See Securities. ) The amount and timing of future sales of our securities will depend upon market conditions and our specific needs.
Securities . The Merger Agreement also provides that ALLETE may notify Alloy Parent of our intent to raise equity capital of up to a total of $300 million in the second half of 2025, subject to certain parameters. If Alloy Parent declines to participate in the equity capital raises or fails to provide timely notice with respect thereto, ALLETE will have the right to issue ALLETE common stock in the public markets for an amount equal to any unfunded amounts under such equity capital raises up to certain limits. (See Note 15. Agreement and Plan of Merger.)
We entered into a distribution agreement with Lampert Capital Markets, in 2008, as amended most recently in 2020, with respect to the issuance and sale of up to an aggregate of 13.6 million shares of our common stock, without par value, of which 2.1 million shares remain available for issuance as of December 31, 2024. For the year ended December 31, 2024, no shares of common stock were issued under this agreement (none in 2023; none in 2022).
During the year ended December 31, 2024, we issued 0.3 million shares of common stock through Invest Direct, the Employee Stock Purchase Plan and the Retirement Savings and Stock Ownership Plan, resulting in net proceeds of $12.9 million (0.3 million shares for net proceeds of $14.9 million in 2023; 0.3 million shares for net proceeds of $16.2 million in 2022). See Note 10. Common Stock and Earnings Per Share for additional detail regarding ALLETE’s equity securities.
Financial Covenants . See Note 8. Short-Term and Long-Term Debt for information regarding our financial covenants.
Pension and Other Postretirement Benefit Plans. Management considers various factors when making funding decisions, such as regulatory requirements, actuarially determined minimum contribution requirements and contributions required to avoid benefit restrictions for the defined benefit pension plans. For the year ended December 31, 2024, we made $25.0 million in cash contributions to the defined benefit pension plans. On January 15, 2025, we contributed $19.1 million in cash to the defined benefit pension plans, and do not expect to make additional cash contributions to the defined benefit pension plans in 2025. We do not expect to make any contributions to the defined benefit postretirement health and life plans in 2025. (See Note 10. Common Stock and Earnings Per Share and Note 12. Pension and Other Postretirement Benefit Plans.)
Off-Balance Sheet Arrangements . Off-balance sheet arrangements are discussed in Note 9. Commitments, Guarantees and Contingencies.
Contractual Obligations and Commercial Commitments . ALLETE has contractual obligations and other commitments that will need to be funded in the future, in addition to its capital expenditure programs. Material contractual obligations and other commitments are as follows:
Long-Term Debt. ALLETE has material long-term debt obligations, including long-term debt due within one year. These obligations include the principal amount of bonds, notes and loans which are recorded on the Consolidated Balance Sheet, plus interest. (See Note 8. Short-Term and Long‑Term Debt.)
ALLETE, Inc. 2024 Form 10-K
Liquidity and Capital Resources (Continued)
Contractual Obligations and Commercial Commitments (Continued)
Pension and Other Postretirement Benefit Plans. Pension and other postretirement benefit plan obligations include the current estimate of future benefit payments. Pension contributions are dependent on several factors including realized asset performance, future discount rate and other actuarial assumptions, Internal Revenue Service and other regulatory requirements, and contributions required to avoid benefit restrictions for the pension plans. Funding for the other postretirement benefit plans is impacted by realized asset performance, future discount rate and other actuarial assumptions, and utility regulatory requirements. Our obligations are estimates and will change based on actual market performance, changes in interest rates and any changes in governmental regulations. (See Note 12. Pension and Other Postretirement Benefit Plans.)
Operating and Finance Lease Obligations . ALLETE has certain operating and finance lease obligations for the minimum payments required under various lease agreements which are recorded on the Consolidated Balance Sheet. (See Note 1. Operations and Significant Accounting Policies.)
Easement Obligations . ALLETE has easement obligations for the minimum payments required under our land easement agreements at our wind energy facilities. (See Note 9. Commitments, Guarantees and Contingencies.)
PPA Obligations. PPA obligations represent our Square Butte, Manitoba Hydro and other PPAs. (See Note 9. Commitments, Guarantees and Contingencies.)
Other Purchase Obligations. ALLETE has other purchase obligations covering our minimum purchase commitments under coal supply and rail contracts, and long-term service agreements for wind energy facilities. (See Note 9. Commitments, Guarantees and Contingencies.)
Credit Ratings . Access to reasonably priced capital markets is dependent in part on credit and ratings. Our securities have been rated by S&P and by Moody’s. Rating agencies use both quantitative and qualitative measures in determining a company’s credit rating. These measures include business risk, liquidity risk, competitive position, capital mix, financial condition, predictability of cash flows, management strength and future direction. Some of the quantitative measures can be analyzed through a few key financial ratios, while the qualitative ones are more subjective. Our current credit ratings are listed in the following table:
Credit Ratings
Moody’s
Issuer Credit Rating
BBB
Baa1
Commercial Paper
First Mortgage Bonds
(a) On May 7, 2024, S&P Global Ratings revised its outlook on ALLETE to negative from stable and affirmed all of its ratings on ALLETE. S&P Global Ratings cited the possibility for higher leverage and weaker financial measures because of the Merger as its rationale for issuing the negative outlook.
(b) Not rated by S&P.
The disclosure of these credit ratings is not a recommendation to buy, sell or hold our securities. Ratings are subject to revision or withdrawal at any time by the assigning rating organization. Each rating should be evaluated independently of any other rating.
Common Stock Dividends . ALLETE is committed to providing a competitive dividend to its shareholders while at the same time funding its growth. ALLETE’s long-term objective is to maintain a dividend payout ratio similar to our peers and provide for future dividend increases. Our targeted payout range is between 60 percent and 70 percent. In 2024, we paid out 91 percent (63 percent in 2023; 77 percent in 2022) of our per share earnings in dividends. On January 30, 2025, our Board of Directors declared a dividend of $0.73 per share, which is payable on March 1, 2025, to shareholders of record at the close of business on February 14, 2025.
Under the Merger Agreement, the Company has agreed not to declare or pay dividends except for quarterly cash dividends payable by us in respect of shares of our common stock on a schedule consistent with our past practices in an amount not to exceed 5 percent per share more than the dividend payable during the prior 12-month period, subject to certain other exceptions. (See Note 15. Agreement and Plan of Merger).
ALLETE, Inc. 2024 Form 10-K
Capital Requirements
ALLETE’s projected capital expenditures for the years 2025 through 2029 are presented in the following table. Actual capital expenditures may vary from the projections due to changes in forecasted plant maintenance, regulatory decisions or approvals, future environmental requirements, base load growth, capital market conditions or executions of new business strategies. Projected capital expenditures exclude amounts for projects that will be sold to third parties upon completion.
Capital Expenditures
Total
Millions
Regulated Operations
High kV Transmission Expansion (a)
Solar RFP (b)
Wind RFP (b)
Storage (b)
Base & Other
Regulated Operations
ALLETE Clean Energy (c)
Corporate and Other
South Shore Energy (d)
Other
Total Capital Expenditures (e)
(a) This includes capital expenditures for the HVDC modernization, Northland Reliability, Duluth Loop, Big Stone South transmission projects and several projects identified in the second phase of the MISO Long Range Transmission Plan that was approved on December 12, 2024. (See Outlook – Transmission.)
(b) These capital expenditures are part of Minnesota Power’s clean-energy transition plans, which include its progress toward 100 percent carbon-free energy supply, as detailed in Minnesota Power’s latest IRP, which was approved by the MPUC in January 2023. These capital expenditures are dependent on successful requests for proposal by Minnesota Power. (See Outlook – EnergyForward.)
(c) Capital expenditures do not include costs related to developing projects that will be sold upon completion as these costs are accounted for as inventory and reflected in Inventories – Net on the Consolidated Balance Sheet.
(d) Our portion of estimated capital expenditures for construction of NTEC, an approximately 600 MW proposed combined-cycle natural gas-fired generating facility to be built in Superior, Wisconsin, which will be jointly owned by Dairyland Power Cooperative, Basin and South Shore Energy.
(e) These amounts do not include capital expenditures for projects considered to be in their preliminary stages.
We are well positioned to meet our financing needs due to adequate operating cash flows, available additional working capital and access to capital markets. We will finance capital expenditures from a combination of internally generated funds, debt and equity issuance proceeds. We intend to maintain a capital structure with capital ratios near current levels. (See Capital Structure. )
Environmental and Other Matters
Our businesses are subject to regulation of environmental matters by various federal, state and local authorities. A number of regulatory changes to the Clean Air Act, the Clean Water Act and various waste management requirements have been promulgated by both the EPA and state authorities over the past several years. Minnesota Power’s facilities are subject to additional requirements under many of these regulations. Minnesota Power is reshaping its generation portfolio, over time, to reduce its reliance on coal, has installed cost-effective emission control technology, and advocates for sound science and policy during rulemaking implementation. (See Note 9. Commitments, Guarantees and Contingencies.)
Market Risk
Securities Investments.
Available-for-Sale Securities. As of December 31, 2024, our available-for-sale securities portfolio consisted primarily of securities held in other postretirement plans to fund employee benefits.
ALLETE, Inc. 2024 Form 10-K
Market Risk (Continued)
INTEREST RATE RISK
We are exposed to risks resulting from changes in interest rates as a result of our issuance of variable rate debt. We manage our interest rate risk by varying the issuance and maturity dates of our fixed rate debt, limiting the amount of variable rate debt, and continually monitoring the effects of market changes in interest rates. We may also enter into derivative financial instruments, such as interest rate swaps, to mitigate interest rate exposure. The following table presents the long-term debt obligations and the corresponding weighted average interest rate as of December 31, 2024:
Expected Maturity Date
Interest Rate Sensitive
Financial Instruments
Thereafter
Total
Fair Value
Long-Term Debt
Fixed Rate – Millions
Average Interest Rate – %
Variable Rate – Millions
Average Interest Rate – %
Interest rates on variable rate long-term debt are reset on a periodic basis reflecting prevailing market conditions. Based on the variable rate debt outstanding as of December 31, 2024, an increase of 100 basis points in interest rates would impact the amount of pre-tax interest expense by $0.5 million. This amount was determined by considering the impact of a hypothetical 100 basis point increase to the average variable interest rate on the variable rate debt outstanding as of December 31, 2024.
COMMODITY PRICE RISK
Our regulated utility operations incur costs for power and fuel (primarily coal and related transportation) in Minnesota, and power and natural gas purchased for resale in our regulated service territory in Wisconsin. Minnesota Power’s exposure to price risk for these commodities is significantly mitigated by the current ratemaking process and regulatory framework, which allows recovery of fuel costs in excess of those included in base rates or distribution of savings in fuel costs to ratepayers. SWL&P’s exposure to price risk for natural gas is significantly mitigated by the current ratemaking process and regulatory framework, which allows the commodity cost to be passed through to customers. We seek to prudently manage our customers’ exposure to price risk by entering into contracts of various durations and terms for the purchase of power and coal and related transportation costs (Minnesota Power) and natural gas (SWL&P).
POWER MARKETING
Minnesota Power’s power marketing activities consist of: (1) purchasing energy in the wholesale market to serve its regulated service territory when energy requirements exceed generation output; and (2) selling excess available energy and purchased power. From time to time, Minnesota Power may have excess energy that is temporarily not required by retail and municipal customers in our regulated service territory. Minnesota Power actively sells any excess energy to the wholesale market to optimize the value of its generating facilities.
We are exposed to credit risk primarily through our power marketing activities. We use credit policies to manage credit risk, which includes utilizing an established credit approval process and monitoring counterparty limits.
Recently Adopted Accounting Pronouncements.
New accounting pronouncements are discussed in Note 1. Operations and Significant Accounting Policies.